Where a property has a stream with enough fall, micro-hydro can be the most productive off-grid power source available. Unlike solar or wind, a hydro turbine runs day and night, and keeps producing through the dark months when solar output is lowest, as long as the stream flows. A few hundred watts of continuous output delivers more energy in a day than a large solar array does in December. Micro-hydro also needs water approvals that solar and wind do not, and it depends on careful measurement and pipe design. This guide covers the power formula, how to measure head and flow, choosing a design flow, sizing the pipeline with real friction calculations, intakes, turbine and generator types, battery and AC systems, water licences and approvals in Canada and the northern United States, cold weather, costs and maintenance.
The power formula
Two quantities decide a hydro site's potential:
- Head: the vertical drop from the water surface at the intake to the turbine, in metres. Gross head is the full vertical drop; net head is what remains after friction in the pipe.
- Flow: the volume of water passing through the turbine, in litres per second (L/s) or cubic metres per second (m³/s).
Natural Resources Canada (NRCan) gives the power formula as:
Power (kW) = flow (m³/s) × head (m) × 9.8 × efficiency
NRCan uses an overall efficiency factor of 0.5 to 0.7 to cover pipe friction and turbine and generator losses. Its own example: 0.3 m³/s at 10 m of head with an efficiency of 0.5 gives about 0.3 × 10 × 9.8 × 0.5 = 14.7 kW.
For small sites it is easier to work in litres per second and watts:
Power (W) = flow (L/s) × head (m) × 9.81 × efficiency
Worked example: high head versus low head
Site A: a mountain creek with 40 m (131 ft) of head and 2 L/s (32 US gal/min) available. Gross power = 2 × 40 × 9.81 = 785 W. At 0.5 overall efficiency, output is about 392 W, or 392 × 24 = 9.4 kWh per day.
Site B: a valley stream with 2 m (6.6 ft) of head. To produce the same 392 W at the same efficiency, it needs 392 ÷ (2 × 9.81 × 0.5) = 40 L/s, twenty times the flow.
Head is cheaper to use than flow. A high-head site needs a small pipe and a small, fast turbine. A low-head site needs large volumes of water, large intakes and channels, and a larger machine. NRCan notes that high-head, low-flow systems cost less than low-head, high-flow systems.
Compare 9.4 kWh a day with your load audit. It is several times the daily use of a typical efficient cabin, which is why even a small hydro site usually becomes the main power source, with solar and a generator in support.
Measuring head
Measure head carefully, because power is directly proportional to it. Common methods:
- Pressure gauge on a hose or pipe: run a full, bubble-free hose or the penstock itself from the intake to the turbine site, close the bottom end and read the static pressure. Each 9.81 kPa is 1 m of head, and each 1 psi is 2.31 ft (0.70 m). On long, steep routes, measure in sections and add them.
- Surveyor's level or laser level and staff: measure the drop in steps down the slope and add them.
- Topographic maps and GPS: useful for screening only. Consumer GPS elevation is not accurate enough for design.
Also measure the pipe route length along the ground, since it sets the friction loss.
Worked example: head from a pressure gauge
A gauge at the bottom of a full, closed hose reads 392 kPa (56.9 psi). Head = 392 ÷ 9.81 = 40.0 m. In imperial units, 56.9 × 2.31 = 131 ft. Both give the same 40 m.
Measuring flow
Bucket method
For small streams, direct the whole flow through a pipe or temporary dam into a bucket of known volume and time how long it takes to fill. The Montana Consumer Guide to Micro-hydro Systems uses a 5 US gal bucket: multiply 5 gallons by 60 divided by the fill time in seconds. A 20-second fill gives 5 × 60 ÷ 20 = 15 US gal per minute, which is 15 × 3.785 ÷ 60 = 0.95 L/s. Repeat several times and average the results.
Float method
For larger streams, find a straight, even reach. Measure the width and average depth at several points to get the cross-section area, then time a float over a measured distance to get its speed. Flow = area × speed. Surface water moves faster than water near the bed and banks, so this method overstates flow unless the speed is reduced to a mean value.
Worked example: float method
A stream is 1.2 m wide with an average depth of 0.15 m, so the area is 1.2 × 0.15 = 0.18 m². A float takes 20 seconds to travel 10 m: 10 ÷ 20 = 0.5 m/s. Flow = 0.18 × 0.5 = 0.09 m³/s, or 90 L/s, at the surface speed, and somewhat less in reality.
Weirs
A weir is a temporary or permanent dam with a notch of known shape. The depth of water flowing over the notch gives the flow from published weir tables. It is more accurate than the float method and suits repeated measurements through the year.
Choosing a design flow
Ontario's guidance is to collect at least one year of flow data before deciding on a site. The Montana guide warns against measuring in one season and extrapolating, and notes that design flow is always less than maximum flow.
- Measure through the low-flow periods, which may be late summer, late winter under ice, or both.
- Design for flow you can rely on through the season you most need power. A system designed for spring flood flow sits idle for much of the year.
- Leave water in the stream. NRCan notes that most systems use only a fraction of the stream's flow, and a water licence may specify how much must remain for fish and other users.
Sizing the pipeline
The pipe from the intake to the turbine is called the penstock. Water flowing through it loses head to friction, and that loss rises steeply as the pipe gets smaller. Choosing the pipe diameter is a trade-off between pipe cost and lost power.
A standard engineering estimate of friction loss in water pipe is the Hazen-Williams formula:
Friction loss (m) = 10.67 × L × Q1.852 ÷ (C1.852 × d4.87)
where L is pipe length in metres, Q is flow in m³/s, d is the pipe's inside diameter in metres, and C is a roughness coefficient, commonly taken as about 150 for smooth plastic pipe. Pipe manufacturers publish friction tables for their own products, which should be used for the final design.
Worked example: choosing a pipe for site A
Site A has 40 m of gross head over a 300 m (984 ft) pipe route, and a design flow of 2 L/s (0.002 m³/s). Friction losses for plastic pipe with C = 150, by inside diameter:
| Inside diameter | Friction loss | Share of gross head | Net head |
|---|---|---|---|
| 40 mm (1.6 in) | 19.3 m | 48% | 20.7 m |
| 50 mm (2.0 in) | 6.5 m | 16% | 33.5 m |
| 63 mm (2.5 in) | 2.1 m | 5% | 37.9 m |
| 75 mm (3.0 in) | 0.9 m | 2% | 39.1 m |
The 40 mm pipe throws away almost half the head. The step from 63 mm to 75 mm gains only 1.2 m more, a 3% improvement, for a noticeably more expensive pipe. In this example the 63 mm pipe is a sensible choice.
Output with 63 mm pipe: using the net head and taking a combined turbine, generator and controller efficiency of 0.55, power = 2 × 37.9 × 9.81 × 0.55 = 409 W, or 409 × 24 = 9.8 kWh per day. That is 409 ÷ 785 = 52% of the gross power, inside NRCan's 0.5 to 0.7 range.
The Montana guide gives example friction figures at 30 US gal/min (1.9 L/s): 1.77 ft per 100 ft of 2 in polyethylene pipe, and 1.17 ft per 100 ft of 2 in PVC. Differences in inside diameter and roughness between products are why actual product data matters.
Pipe materials
| Material | Notes from the Montana guide |
|---|---|
| PVC | Low friction; degraded by sunlight, so bury, cover or paint it; needs sand or fine-gravel bedding; loses flexibility in cold |
| Polyethylene (PE) | Low friction; resists sunlight; more tolerant of freezing |
| Steel | Moderate friction; corrodes quickly when buried |
Do not use light-gauge irrigation pipe. Avoid sharp bends and diameter reductions, and allow for thermal expansion at joints.
Pressure and water hammer
Static pressure at the bottom of the penstock is 9.81 kPa per metre of head. At 40 m that is 392 kPa (57 psi). Choose pipe rated well above the static pressure in its lower sections. Closing a valve or nozzle suddenly sends a pressure surge, called water hammer, up the pipe that can be several times the static pressure and can burst it. Fit slow-closing valves and close them gradually.
Intakes and screens
The intake diverts water into the pipe and keeps out debris, sediment, fish and air. Recommendations from the Montana guide:
- Use screen mesh of about 6 mm (1/4 in), in brass or stainless steel.
- Allow about 1 square yard (0.84 m²) of screen area per cubic foot per second (28.3 L/s) of flow, which is about 0.03 m² per L/s.
- Set screens as close to vertical as possible, with sloped sides so they clean themselves. Horizontal screens are usually ineffective. Trash racks are typically set at 60 to 80 degrees.
- Keep the pipe entrance submerged by at least four times its diameter, so the intake does not draw in air through a vortex.
Many systems also use a settling basin or forebay tank so sand and silt drop out before the water enters the penstock. Sediment wears turbine nozzles and runners quickly.
Turbines and generators
Turbine types by head
| Turbine | Head range in the Montana guide |
|---|---|
| Impulse (Pelton, Turgo) | About 7.6 m (25 ft) and more |
| Crossflow | Some models for 0.9 to 3 m (3 to 10 ft) |
| Francis-type micro units | From about 1.2 m (4 ft) |
| Kaplan and propeller | From about 0.6 m (2 ft) |
| Portable low-head units | 0.6 to 1.5 m (2 to 5 ft), up to 1 kW |
The guide classes low head as 2 to 20 ft (0.6 to 6 m) and high head as above 25 ft (7.6 m). Pump-as-turbine units, standard centrifugal pumps run in reverse, are also used at some sites. Impulse turbines fit most mountain and hill sites with small flows, and many allow nozzles to be changed to match seasonal flow.
Generator efficiency
The Montana guide gives full-load efficiency of 75 to 90% for synchronous generators and 75 to 95% for induction generators, falling to 65 to 85% at part load for induction units. Belt drives can reach 98% by manufacturers' ratings, and well-matched direct drives approach 100%.
Battery-based and AC systems
Battery-based systems
Small turbines with DC output, commonly at 12, 24 or 48 V, charge a battery bank continuously. An inverter supplies AC loads, and the battery covers peaks well above the turbine's output. NRCan notes that battery-based systems start at about 0.1 kW. Because hydro charges around the clock, the battery can be much smaller than for a solar-only system: it only has to cover the gap between peak demand and steady output, not several days without input.
Worked example: battery for a 400 W hydro system
Site A delivers about 409 W continuously. The household's evening peak is 2,000 W for 2 hours. During those hours the battery supplies 2,000 − 409 = 1,591 W, so it discharges 1,591 × 2 = 3,182 Wh. The rest of the day the turbine refills it. A bank with about 4 to 5 kWh of usable capacity covers this with margin, and the inverter is sized for the 2,000 W peak plus motor starting surges.
Diversion and load control
A hydro turbine must never run without a load, because it can overspeed and its voltage can rise to damaging levels. When the battery is full, the charge controller diverts surplus power to a dump or ballast load, usually a water or air heating element. In AC systems without batteries, an electronic load controller (ELC) for a synchronous generator, or an induction generator controller (IGC), holds voltage and frequency steady by diverting whatever the household is not using to a ballast load. The Montana guide notes that stand-alone AC units may need these controllers to handle motor starting loads.
AC systems
Larger sites can generate AC directly with no battery. The system must then be sized for the household's peak demand, as NRCan points out, since there is no storage to cover peaks.
Water licences and approvals
NRCan states that a water licence or other approval is required before taking surface water, and lists the possible approvals: provincial and federal environmental approvals, a water use agreement, an operating agreement, a land lease, federal permits for navigable waters, and building permits.
British Columbia
- Under the Water Sustainability Act, a licence is needed to divert, use or store water from a stream, which includes rivers, creeks, lakes, ponds and wetlands, and to build works.
- Applicants must state how much power will be generated where water is used for power.
- A Crown land tenure under the Land Act is required for the "Power General" and "Power Commercial" purposes, and proof of tenure or an application for one is part of the licence application.
- Application fees are based on the area affected, and an annual rental applies based on the quantity and purpose authorized.
- Applicants must answer staff requests within 2 weeks or the application may be rejected. Staff may ask for further studies, such as a fish report.
Ontario
Ontario's guidance lists a water licence, land-use approval and other local permits. Apply to the Ministry of Natural Resources for a site release, contact the municipality and local conservation authority, and complete an environmental screening. The project must also meet electrical, building and site regulations.
Northern United States
Water rights rules vary by state. In Montana, for example, water is state property, owning land along a stream does not give a right to use its water, and rights follow prior appropriation: first in time, first in right. Micro-hydro is a beneficial use, but a permit to appropriate water is needed, and the Montana guide notes that water returned to the stream after use still requires a water right.
Cold weather
- Bury the penstock below frost depth where possible. PVC must be buried or protected and becomes less flexible in cold.
- Keep water moving. A pipe running full and flowing is far less likely to freeze than one left standing or partly drained.
- Plan for low water and ice together: year-round systems need protection against both, and bypass valves can be used during freezing conditions.
- Check the intake regularly in early winter, when frazil and anchor ice can block screens.
- Water wheels cannot run when ice is present.
Costs, life and maintenance
NRCan gives total installed costs of about $1,500 to $2,500 per kW, and $2,500 per kW or more for systems under 5 kW, partly because of the battery and inverter. Ontario gives $2,000 to $9,000 per kW installed for low or ultra-low head systems. These are published estimates; get current quotes. Operating costs are low, there is no fuel, and NRCan gives a service life of 20 to 30 years. Ontario notes that most turbines last at least 25 years.
Worked example: cost per kilowatt-hour
A 409 W battery-based system costs $10,000 installed and runs 90% of the year. Annual output is 409 × 8,760 × 0.90 = 3,225 kWh. Over 25 years that is 3,225 × 25 = 80,625 kWh, and the capital cost is 10,000 ÷ 80,625 = $0.12 per kWh, before battery replacements.
Maintenance, from Ontario's guidance, runs on weekly, monthly and yearly cycles:
- keep the intake and screens clear of leaves and debris;
- clear silt from the intake and settling basin;
- check the pipeline and turbine for leaks;
- grease bearings and other machinery, and tighten belts;
- if the system uses flooded lead-acid batteries, top them up and equalize them regularly.
Key points
- Power (W) = flow (L/s) × head (m) × 9.81 × efficiency; NRCan uses an overall efficiency of 0.5 to 0.7.
- Head is cheaper to use than flow: 2 L/s at 40 m gives the same power as 40 L/s at 2 m.
- Measure head with a pressure gauge (9.81 kPa or 2.31 ft per psi) or a level, and measure flow through at least a year, including low-flow seasons.
- Size the penstock with friction calculations; on site A a 63 mm pipe loses 5% of head where a 40 mm pipe loses 48%.
- Screen the intake with about 6 mm mesh, keep the pipe entrance submerged at least four diameters, and use slow-closing valves to prevent water hammer.
- Always keep the turbine loaded with a diversion or ballast load controller; a battery-based system needs far less storage than solar.
- Get a water licence and other approvals before building: in BC under the Water Sustainability Act, in Ontario with a Ministry of Natural Resources site release, and under state water rights law in the US.
This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.
The Comprehensive Off-Grid Manual
Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.
More guides
Off-Grid Solar Power: How to Size a System
Size an off-grid solar system for Canadian winters: load audit, peak sun hours, array, MPPT, inverter, wiring, fusing, with a full cabin example.
Off-Grid Batteries: LiFePO4 vs Lead-Acid
LiFePO4 vs lead-acid for off-grid power: usable capacity, cycle life, cold-weather charging, bank sizing, wiring, ventilation and lifetime cost.
The Electrical Load Audit and Efficiency
Measure every load with meters and battery monitors, find duty cycles and standby waste, plan peak demand, audit by season, and price efficiency upgrades.