The land you buy decides most of what an off-grid home will cost and how well it will work. Sun, water, soil, access and the rules that apply to a parcel cannot be changed after the sale, and problems that a town lot would never have, such as no legal access or no approvable septic site, are common in rural land. This guide sets out what to check before you buy, where to find the information in Canada and the northern United States, how to read title and survey records, and which conditions to put in an offer.
Start with your requirements
Write down what the property must have before you look at listings. A clear list keeps attention on the things that are expensive or impossible to fix, rather than on views and price.
| Requirement | Why it matters | How to check |
|---|---|---|
| Legal, year-round access | Without it you may not get permits, insurance, deliveries or emergency services | Title search, road authority records, a winter visit |
| Zoning that allows a dwelling | Some rural parcels allow no residence, or only seasonal use | Planning department, zoning bylaw and map |
| A reliable water source | A house cannot be approved or lived in without one | Well records, neighbours' wells, water licences, a test |
| An approvable sewage site | Soil, slope, rock and water table limit where a system can go | Soil assessment by an authorized professional |
| Winter sun on a building site | Solar output and passive heat depend on it | Site visit near the winter solstice, sun path tools |
| Low exposure to flood, slope and fire hazards | Hazards affect permits, insurance and safety | Hazard maps, local government, a site visit |
| Acceptable distance to services | Hospital, fire hall, supplies and work | Maps, travel time in winter conditions |
Location and distance
Measure distances in travel time in winter, not kilometres in summer. Check:
- The nearest hospital with an emergency department, and how an ambulance would reach the property.
- Whether the property is inside a fire protection area served by a fire department. This affects insurance availability and price.
- Building supply, fuel and propane delivery: whether suppliers deliver to the road, and what they charge.
- Cell and internet coverage at the building site, not only at the road. Federal and provincial coverage maps are a starting point; test with a phone on site.
- School bus routes, if relevant, and whether the road is plowed by the time the bus runs.
- Nearby land uses that may change: gravel pits, logging, mining claims, quarries, industrial sites, intensive livestock operations and planned highways.
Title: what you are actually buying
In Canada, land ownership is recorded in provincial land registries, such as the Land Title Office in British Columbia, Land Titles offices in the Prairie provinces and the land registry system in Ontario. A title search shows the registered owner and every registered charge on the land. Have your lawyer, or a notary in Quebec or BC, order and review the search before your offer becomes firm.
Charges to look for
- Easements and rights-of-way. These give someone else the right to cross or use part of the land: a neighbour's driveway, a power line corridor, a pipeline, a water line. They can cut across the best building site, and they usually bind future owners.
- Restrictive covenants. These limit what may be built or done: minimum house sizes, bans on mobile homes, limits on tree cutting, building schemes in rural subdivisions. Read every covenant in full.
- Mortgages, liens and judgments. These must be cleared at or before closing. Your lawyer handles this, but a heavily charged title can delay a sale.
- Statutory charges and notices. Local governments and provinces can register notices on title, for example about a geotechnical hazard covenant, an order to remove an unsafe building, or work done without a permit.
- Exceptions and reservations. Older Crown grants and titles can reserve mineral rights, rights to timber or rights of access to the Crown. Title to the surface often does not include subsurface minerals. Ask your lawyer what the title includes and excludes.
Boundaries and survey
A listing's acreage and lines on an online map are not a survey. Find the registered survey plan for the parcel, and locate the survey posts or monuments on the ground. In rural areas, posts can be missing, buried or disturbed by logging and road work.
- Fences, old roads and tree lines are often not on the boundary.
- Buildings, wells, septic fields and driveways sometimes sit partly on a neighbour's land, or a neighbour's sit on yours.
- Waterfront boundaries can be complicated. Lakes and rivers move, and a strip of Crown land or a road allowance may lie between the lot and the water.
If the posts cannot be found, or if any structure is near a line, hire a professional land surveyor before the deal becomes firm. In Canada surveyors are licensed provincially, for example as BC Land Surveyors or Ontario Land Surveyors. A surveyor's report can show encroachments, setback problems and whether the actual boundary matches what you were told.
Legal and physical access
A parcel can have a usable track to it and no legal right to use it. Legal access normally means one of these:
- Frontage on a public road that the province or municipality maintains.
- Frontage on a public road that exists in law but is not built or not maintained, sometimes called a road allowance or unopened road. You may need permission to build or upgrade it, and you may be responsible for its upkeep.
- A registered easement over a neighbour's land, with terms you can read on title.
- Water access only, by boat or barge, with a dock or landing that may need its own approvals.
A parcel with no registered right of access is sometimes called landlocked. Informal permission from a neighbour can be withdrawn, and it ends when the neighbour sells. Insurers, lenders and building departments may treat a property without legal access as unbuildable or uninsurable.
Also check physical access in every season: whether the road is plowed, whether it washes out in spring, whether it has seasonal load limits, and whether it is gated or shared with logging or mining traffic. Our guide to private roads and winter access covers road building and upkeep.
Zoning and land-use rules
Zoning bylaws set lot size, building type and size, building location, permitted uses and parking. Rural zoning can also limit the number of dwellings, minimum dwelling size, secondary suites, home businesses, livestock and the use of trailers or tiny houses. Ask the planning department:
- What zone is the parcel in, and is a single-family dwelling permitted?
- What are the setbacks from lot lines, roads and water?
- Are there development permit areas for hazards such as steep slopes, floodplains, wildfire or riparian areas?
- Is the land in an agricultural reserve or protected agricultural zone, such as British Columbia's Agricultural Land Reserve or Quebec's protected agricultural zone, where non-farm uses and subdivision are restricted?
- In Ontario, is any part of the parcel regulated by a conservation authority? Conservation authorities issue permits for development, alterations and placing fill in hazard areas such as floodplains, wetlands and shorelines.
- Are there pending changes to zoning or the official community plan?
If the parcel does not suit your plans, a variance or rezoning may be possible, but it is never guaranteed. Make any purchase that depends on one conditional on its approval, or do not buy.
Worked example: how much of the lot can you build on?
The setbacks here are example values; use the numbers in your own zoning bylaw and other rules.
A rectangular lot is 100 m (328 ft) along the road and 200 m (656 ft) deep: 20,000 m², or 2 ha (4.9 acres). A creek runs along the full back line. Suppose the rules require buildings to be 15 m from the road, 7.5 m from each side line and 30 m from the creek.
Width available: 100 − 7.5 − 7.5 = 85 m.
Depth available: 200 − 15 − 30 = 155 m.
Building envelope: 85 × 155 = 13,175 m², or about 66% of the lot.
Now subtract the parts that are not usable: a 40 m × 60 m wet area near the creek inside the envelope (2,400 m²), and space for the septic field and its reserve, which must also keep its separation distance from the well. The remaining area may still be large, but on a narrow or steep lot the same rules can leave almost nowhere to build. Draw this before you make an offer.
Water
Never assume water will be found. Check:
- Existing wells. Ask the seller for the well construction report, pump test and recent water tests. Provinces keep well databases; in BC, the BC Water Resources Atlas shows water wells and aquifers on a map. Neighbours' well depths and yields are a guide to what you may find.
- Water licences. If the property uses a creek, lake or spring, find out whether a licence exists and whether it is attached to this parcel. In BC, the Water Licence Search Tool lists surface and groundwater licences, and licence terms name the property the licence attaches to.
- Water quality. Make the offer conditional on a satisfactory lab test for bacteria and a chemical analysis, including arsenic, uranium, manganese and nitrate where geology or land use makes them likely.
- Quantity. If a creek or spring is the source, ask about late-summer flow and look at it in August or September.
Our guides to water systems and to water rights and licensing cover sources, testing and licensing.
Sewage and soil
A conventional septic dispersal field needs suitable soil depth above rock and the seasonal high water table, a workable slope and enough area to meet separation distances from wells, water and lot lines. Shallow soil over bedrock, clay, high water tables and steep slopes all push costs up, and on some parcels no system can be approved.
Before the offer becomes firm, have an authorized professional dig test pits and assess the site. In BC this is a Registered Onsite Wastewater Practitioner or professional engineer; in Ontario, a designer qualified under the Building Code. Their report should say what type of system the site can take and roughly where it can go. Our guide to septic systems covers types and sizing.
Existing buildings and systems
Many rural parcels come with a cabin, shed, trailer or partly finished house. These can save years of work or carry hidden costs.
- Permit history. Ask the building department what permits were issued for the property and whether final inspections were passed. A building without permits may have to be brought up to code, inspected with walls opened, or removed before you can get a permit for anything new.
- Legal non-conforming uses. A building that was lawful when built but does not meet today's setbacks or zoning may be allowed to stay, but rules often limit how much it can be expanded or rebuilt after damage. Ask what applies.
- Wood stoves and chimneys. An unlisted stove, a stove without its label, or a chimney with too little clearance can make a building uninsurable until fixed. In Canada, a WETT inspection report is the usual evidence insurers ask for.
- Power systems. Ask for the electrical permit and inspection records, the battery age and type, and equipment manuals. Batteries near the end of their life are a large, near-term cost.
- Wells and septic. Ask for the well construction report, the septic filing or permit, and the last pumping record. A septic system with no record may need assessment before you can rely on it.
- Fuel tanks. Old above-ground or buried oil and fuel tanks can leak. Insurers often ask about them, and removing a leaking buried tank and contaminated soil is expensive.
Hazards and contamination
- Flood. Check provincial and local flood maps, and look for high-water marks, debris lines and flattened vegetation along creeks. In the US, check the FEMA flood map; in participating communities, flood insurance is mandatory in high-risk zones for government-backed mortgages.
- Slope and soils. Tension cracks, leaning trees, seepage on slopes and slumped ground are warning signs. A covenant on title may already require a geotechnical report.
- Wildfire. Dense forest around the building site, a single access road and distance from fire protection all raise the risk.
- Radon. Health Canada's guideline is 200 Bq/m³. Radon can only be measured in a building, so test any existing house for at least three months, ideally in the heating season.
- Contamination. Old fuel tanks, buried garbage, abandoned vehicles, old orchards treated with arsenical sprays, and past industrial or mining use can contaminate soil and water. Ask the seller directly and look for evidence on site. A larger or higher-risk purchase may justify an environmental site assessment.
Our guide to reading climate and site hazards covers how to assess each of these.
Price, taxes and financing
Transfer tax
Most provinces charge a tax or fee when land changes hands. British Columbia's property transfer tax is 1% of fair market value up to $200,000, 2% on the portion from $200,000 to $2,000,000, and 3% above $2,000,000, with a further 2% on residential value above $3,000,000.
Worked example: BC property transfer tax on a rural parcel
A parcel's fair market value is $350,000.
- 1% on the first $200,000: $2,000
- 2% on the next $150,000: $3,000
Tax payable: $2,000 + $3,000 = $5,000, due at registration, in addition to legal fees and the price. Check whether you qualify for any exemption before closing, and use your own province's rates outside BC.
Property tax
Rural property taxes are often lower than urban ones, but services are fewer. Ask for the last tax notice, and check whether there are local service levies for fire protection, road upkeep or water districts. Check whether the property has a farm classification and what would happen to it if farming stopped.
Financing
Lenders often treat vacant land, off-grid houses, properties without year-round access and homes heated only by wood as higher risk. Expect stricter terms on such properties than on a conventional house. Ask a lender for a written answer about the specific property before you remove a financing condition.
Insurance
Ask an insurer for a quote on the specific property before you buy, describing the access, heating, power system and distance to the nearest fire hall. Some insurers decline properties outside fire protection areas or with only wood heat. Our guide to zoning, permits, building codes and insurance covers what insurers ask.
Visiting the land
Walk the whole property, ideally more than once and in more than one season. Take a compass, a printed survey plan, a GPS or phone app, a soil probe or shovel, and a notebook.
- Stand at likely building sites at noon and look south. Note trees, ridges and buildings that would block a low winter sun.
- Look for standing water, wetland plants and seepage; they show a high water table.
- Check how snow, water and wind would reach the building site and the road.
- Talk to neighbours. They know about wells, flooding, road problems, wildlife and local disputes.
- Ask the local fire department whether they serve the address and how long a response would take.
Conditions in the offer
Rural purchases need more and longer conditions than a town house. Work with a lawyer and a realtor experienced in rural land, and give yourself enough time.
| Condition | What it covers |
|---|---|
| Title review | Lawyer's satisfaction with easements, covenants, charges and exceptions |
| Survey | Boundaries located, no encroachments, setbacks met |
| Zoning and permits | Confirmation that your intended use is allowed; a building permit is obtainable |
| Water | Satisfactory quantity and lab tests; existing licence confirmed and transferable |
| Sewage | Site assessment shows an approvable system and location |
| Building inspection | For existing buildings, including the wood stove, chimney and power system |
| Financing and insurance | Written approval for this property |
| Seller documents | Permits, well and septic records, equipment manuals, tax notices |
Water testing, soil assessment and surveying take time to book, and labs and practitioners are busiest in summer. Ask each professional how long they need before you set the condition dates.
Key points
- List your requirements first. Legal access, zoning, water and an approvable sewage site cannot be fixed after the sale.
- Have a lawyer review the title for easements, covenants, notices and reservations such as mineral rights.
- Locate survey posts and hire a land surveyor if any building, well or septic field is near a line.
- Confirm legal access in writing; informal permission across a neighbour's land is not access.
- Check well records, water licences and lab tests, and have the soil assessed for sewage before going firm.
- Check flood, slope, wildfire, radon and contamination risks, and get insurance and lending answers for the specific property.
- Budget for transfer tax: in BC, a $350,000 parcel carries $5,000 in property transfer tax.
This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.
The Comprehensive Off-Grid Manual
Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.
More guides
Reading Climate and Site Hazards Before You Build
Use code climate data, work out roof snow loads and winter shadows, read flood return periods, and assess slopes, soils, permafrost, wildfire and radon risks.
Zoning, Permits, Building Codes and Insurance for Off-Grid Homes
How zoning, building codes, electrical, gas and sewage permits apply to off-grid homes in Canada and the US, the inspection process, and what insurers ask.
Off-Grid Solar Power: How to Size a System
Size an off-grid solar system for Canadian winters: load audit, peak sun hours, array, MPPT, inverter, wiring, fusing, with a full cabin example.