Every building site has a climate and a set of natural hazards that decide how the house must be built and where it should go. Cold, snow, wind, sun, water, unstable ground, wildfire and radon can all be assessed before you build, from published data and from what you see on the land. This guide explains where to find design climate data in Canada and the northern United States, how to work out snow loads and winter shading, how to read flood return periods, and which ground and air hazards need a professional's assessment.
Where to find climate data
- Building code climate tables. Appendix C of the National Building Code of Canada, Table C-2, lists design data for hundreds of locations: January design temperatures, heating degree-days, ground snow and rain loads, wind pressures and more. Provincial codes reproduce or adapt it; Ontario publishes its values in Supplementary Standard SB-1. These are the values a building official will use.
- Climate normals. Environment and Climate Change Canada publishes 30-year averages of temperature, precipitation, snow and frost for weather stations across the country. They are useful for frost-free season, monthly rain and snow, and typical winter lows.
- Future climate values. ClimateData.ca publishes projections, including future building design values, for planning buildings that will stand for decades.
- Local knowledge. Neighbours, road crews and the building department know where snow drifts, which roads flood and which slopes have moved.
Code values describe a town or weather station. A site in a valley bottom, on a ridge or at higher elevation can be colder, snowier or windier. Where your site differs from the nearest listed location, ask the building department which values apply.
Cold, snow and wind: code values
The table shows code climate values for a range of locations in British Columbia, chosen because the province spans almost every Canadian climate, from dry interior valleys to some of the heaviest snow in the country. Look up your own location in your province's code table.
| Location | January design temp. (2.5%) | Heating degree-days | Ground snow load Ss | Rain load Sr | Hourly wind pressure (1 in 50) |
|---|---|---|---|---|---|
| Kamloops | −23 °C (−9 °F) | 3,450 | 1.8 kPa | 0.2 kPa | 0.40 kPa |
| Nelson | −18 °C (0 °F) | 3,500 | 4.2 kPa | 0.1 kPa | 0.33 kPa |
| Revelstoke | −20 °C (−4 °F) | 4,000 | 7.2 kPa | 0.1 kPa | 0.32 kPa |
| Stewart | −17 °C (1 °F) | 4,350 | 7.9 kPa | 0.8 kPa | 0.36 kPa |
| Williams Lake | −30 °C (−22 °F) | 4,400 | 2.4 kPa | 0.2 kPa | 0.35 kPa |
| Prince George | −32 °C (−26 °F) | 4,720 | 3.4 kPa | 0.2 kPa | 0.37 kPa |
| Smithers | −29 °C (−20 °F) | 5,040 | 3.5 kPa | 0.2 kPa | 0.40 kPa |
| Fort St. John | −35 °C (−31 °F) | 5,750 | 2.8 kPa | 0.1 kPa | 0.39 kPa |
| Fort Nelson | −39 °C (−38 °F) | 6,710 | 2.4 kPa | 0.1 kPa | 0.30 kPa |
Ss is the ground snow load with a 1-in-50 chance of being exceeded in any year. Sr is the load from rain falling on that snow. 1 kPa equals about 20.9 lb/sq ft. Coldest is not snowiest: Fort Nelson has about 70% more heating degree-days than Revelstoke and one-third of its ground snow load.
Working out a roof snow load
For light-frame houses designed under Part 9 of the code, the specified roof snow load is:
S = Cb × Ss + Sr
Cb is 0.45 where the whole width of the roof is no more than 4.3 m (14 ft), and 0.55 for other roofs. The result may never be less than 1 kPa. Larger buildings, unusual roof shapes and roofs where snow can drift or slide onto a lower roof are designed by an engineer under Part 4, which adds factors for wind, slope and drifting.
Worked example: snow on a cabin roof
A cabin roof covers a horizontal area of 10 m × 12 m (32.8 ft × 39.4 ft), or 120 m² (1,292 sq ft). The roof is wider than 4.3 m, so Cb = 0.55.
At Prince George: S = 0.55 × 3.4 + 0.2 = 2.07 kPa (43 lb/sq ft). Total load on the roof: 2.07 kPa × 120 m² = 248 kN, which is the weight of about 25 tonnes.
At Revelstoke: S = 0.55 × 7.2 + 0.1 = 4.06 kPa (85 lb/sq ft). Total: 4.06 × 120 = 487 kN, about 50 tonnes.
At Kamloops: S = 0.55 × 1.8 + 0.2 = 1.19 kPa (25 lb/sq ft). Total: 1.19 × 120 = 143 kN, about 15 tonnes.
The same cabin needs rafters, beams, posts and footings sized for more than three times the snow at Revelstoke as at Kamloops. A prefabricated cabin, shipping container or tiny house designed for one region may be unsafe in another. Ask the maker which snow load the design was engineered for, in kPa or lb/sq ft, and compare it with your location.
Snow behaviour on site
- Snow drifts into the lee of ridges, buildings and tree lines, and against lower roofs next to higher ones.
- Snow slides off metal roofs in large masses. Keep doors, paths, decks, propane tanks, meters and vent pipes out of the slide zone, or fit snow guards.
- Solar panels shed snow onto whatever is below them. Leave a clear area in front of ground-mounted arrays so snow can pile up without burying the lower edge.
- Deep snow buries fuel tanks, generator exhausts and air intakes. Raise them or protect them, and mark them for snow clearing.
Wind
The code's hourly wind pressures are for open terrain at a standard height. Exposed ridges, lakeshores, coastlines and open prairie see stronger wind than sheltered forest sites; buildings there need careful attention to roof tie-downs, cladding and window choice. Wind also drives snow into vents and rain through gaps, and it increases heat loss from a leaky building.
Trees are the most common wind hazard on wooded rural sites. Note leaning trees, trees with dead tops or rot at the base, and shallow-rooted trees on wet ground near any proposed building, power line or array. Have hazard trees assessed and felled before you build; it is far easier and safer with no structure in the way. Our guide to chainsaws and woodlot management covers felling.
Microclimate
Small differences in position on a property can change winter conditions noticeably.
- Cold-air drainage. Cold air is denser than warm air and flows downhill on calm, clear nights, pooling in valley bottoms and hollows. These frost pockets have colder nights, later spring frosts and earlier fall frosts. A building site partway up a slope is often warmer at night than the valley floor.
- Slope aspect. In the northern hemisphere, south-facing slopes receive more winter sun and lose snow sooner. North-facing slopes stay colder and hold snow longer.
- Water. Large lakes moderate temperatures nearby but bring fog, wind and, in some regions, lake-effect snow.
- Shelter. A forest edge or hill on the side of the prevailing winter wind reduces heating demand, but must not block the winter sun.
Sun access
A low winter sun casts long shadows. The shadow of an object is its height divided by the tangent of the sun's height above the horizon. The table gives this as a multiplier on 21 December, the shortest day, at solar noon and two hours either side of it.
| Latitude | Sun height at noon | Noon shadow, × object height | Sun height at 10:00 or 14:00 solar time | Shadow at 10:00 or 14:00, × height |
|---|---|---|---|---|
| 43° N | 23.6° | 2.3 | 18.0° | 3.1 |
| 46° N | 20.6° | 2.7 | 15.4° | 3.6 |
| 49° N | 17.6° | 3.2 | 12.8° | 4.4 |
| 52° N | 14.6° | 3.9 | 10.1° | 5.6 |
| 55° N | 11.6° | 4.9 | 7.5° | 7.6 |
| 58° N | 8.6° | 6.6 | 4.8° | 11.9 |
| 60° N | 6.6° | 8.7 | 3.0° | 18.9 |
At 10:00 and 14:00 solar time on the solstice the sun is roughly 29° east or west of due south. Solar time differs from clock time by your position in the time zone and by daylight saving time.
Worked example: can trees shade the array?
A solar array is planned at 52° N. A stand of spruce 18 m (59 ft) tall lies due south of it.
Noon shadow: 18 m × 3.9 = 70 m (230 ft).
Shadow at 10:00 and 14:00: 18 m × 5.6 = 101 m (331 ft), falling toward the north-west and north-east.
To keep the array clear from 10:00 to 14:00 in late December, the trees to the south, south-east and south-west would need to be more than about 100 m away, or lower than the array's line of sight to the sun. In practice, many owners accept some shading at the solstice, clear the nearest trees, and rely on the generator for the darkest weeks. Measure on site rather than guessing: stand at the array location and check the sun's path, or use a solar site survey tool.
Flood
Reading return periods
A "100-year flood" is a flood with a 1% chance of being equalled or exceeded in any year. It can happen in consecutive years. Over a longer period the chance of at least one such flood grows:
Chance of at least one flood in n years = 1 − (1 − p)n, where p is the annual chance.
Worked example: flood odds over a mortgage
For a 100-year flood, p = 0.01. Over 25 years: 1 − 0.9925 = 1 − 0.778 = 0.22, a 22% chance. Over 30 years: 1 − 0.9930 = 0.26, a 26% chance.
For a 200-year flood, p = 0.005. Over 30 years: 1 − 0.99530 = 0.14, a 14% chance.
A building at the edge of a mapped 100-year floodplain is not safe from flooding; it has roughly a one-in-four chance of seeing a flood of that size over a typical mortgage term.
Maps and rules
- In Canada, flood mapping and floodplain rules come from provinces, local governments and, in Ontario, conservation authorities. Ontario uses three flood standards depending on location: Hurricane Hazel, the Timmins storm and the 100-year flood. Conservation authorities issue permits for development and fill in regulated hazard areas.
- In British Columbia, local governments make floodplain bylaws, taking provincial guidelines into account. Provincial guidance for alluvial fans asks assessors to consider a 1-in-200-year flood.
- In the US, FEMA flood maps show high-risk zones, labelled A and V. In communities in the National Flood Insurance Program, flood insurance is mandatory in high-risk areas for government-backed mortgages.
Many small creeks are not mapped at all. Look for high-water marks on trees and banks, debris caught in branches, scoured channels, sediment on the ground and signs of past ice jams. Ask neighbours about spring freshet and ice jam flooding. Sites at the mouth of a steep creek, on an alluvial fan, can be hit by debris floods carrying rock and logs; these need assessment by a qualified professional.
Our guide to floods, ice storms and severe winter covers preparing an existing property.
Rain and surface runoff
Away from creeks, the more common water problem is runoff from heavy rain and snowmelt reaching a building. Since 1 mm of rain on 1 m² produces 1 L of water, runoff volumes are easy to estimate.
Worked example: runoff from a roof and yard
A 25 mm (1 in) rainstorm falls on a 120 m² (1,292 sq ft) roof: 120 × 25 = 3,000 L (about 790 US gal). The same storm on 400 m² of compacted yard and driveway sloping toward the house adds up to 400 × 25 = 10,000 L, less what soaks in.
That water has to go somewhere other than against the foundation. Grade the ground away from the building, carry downspouts well clear of it, and intercept upslope runoff with a swale or ditch that leads around the house to a safe outlet. Look at where water runs during a heavy rain or spring melt before fixing the house position.
Climate normals describe the past 30 years. Many regions are seeing more intense rainfall, changing snow patterns and longer fire seasons. Where projections from ClimateData.ca or provincial agencies show a trend, design toward the more severe end of the range for anything hard to change later, such as building location, foundations and drainage.
Ground hazards
Slopes and landslides
Warning signs of unstable ground include tension cracks across a slope, curved or leaning tree trunks, slumped or hummocky ground, seepage and springs on a slope, and fresh scarps at the top of banks. Building near the top or toe of a steep slope, or on a slope cut by a road, usually requires a geotechnical engineer's report, and local governments may register a covenant on title requiring it. Rockfall and snow avalanche paths in mountain areas need the same kind of assessment.
Soils and groundwater
Organic soils, soft clay, loose fill and a high water table all limit what a site can carry and how deep a foundation must go. Code tables set bearing pressures from 40 kPa for soft clay to 500 kPa for sound rock, and halve the allowable pressure on gravel, sand or silt where the water table is close below the footing. Our guide to site work, drainage and foundations in frost country covers soil assessment and foundation choice.
Permafrost
In the Yukon, the Northwest Territories, Nunavut and the far north of the provinces, ground may stay frozen year-round. A heated building on ice-rich permafrost can thaw the ground under it and settle badly. Building on permafrost needs specialist design; CSA PLUS 4011 is the Canadian technical guide for infrastructure in permafrost. Our regional guides for the North cover local practice.
Earthquakes
Seismic hazard is highest on the BC coast and in parts of Quebec and the Yukon. The building code sets seismic design data by location, and Part 9 includes extra bracing requirements where hazard is high. Ask the building department what applies at your site.
Wildfire
Wildfire hazard depends on the fuel around the site, slope, the number of access routes and distance to fire protection. A building site upslope from dense conifer forest, reached by a single road, is the highest-risk combination. FireSmart Canada publishes guidance on reducing fuel around buildings. Our guide to wildfire preparedness for rural properties covers site layout, materials and fuel management.
Radon
Radon is a radioactive gas from uranium in soil and rock. It enters buildings through foundations and is the leading cause of lung cancer in people who have never smoked. Health Canada's guideline is 200 Bq/m³; the US EPA's action level is 4 pCi/L, or 148 Bq/m³.
Radon levels vary from house to house and cannot be predicted from a site visit. In Health Canada's cross-Canada survey, about 6.9% of Canadians lived in homes above the guideline; a 2024 update found about 17.8% of houses at or above it. Manitoba, New Brunswick, Saskatchewan and the Yukon had the highest shares, and some health regions had 23% to 44% of homes above the guideline.
- On bare land, plan for radon from the start: a sealed floor, a gas-tight sump cover and a sub-slab pipe that can later be connected to a fan. Current codes require provisions for radon control in new houses.
- In an existing building, test for at least three months, preferably in fall and winter, with a long-term test device.
- Retest after major renovations or changes to the foundation, ventilation or heating.
Site hazard checklist
| Hazard | What to check | Who assesses |
|---|---|---|
| Cold and snow | Code design temperature, Ss and Sr; local drifting | Building department, designer |
| Wind and trees | Exposure, hazard trees near buildings and lines | Owner, certified arborist or faller |
| Sun access | Winter shadows on house and array sites | Owner, solar designer |
| Flood | Maps, high-water marks, creek mouths and fans | Local government, conservation authority, qualified professional |
| Slope stability | Cracks, leaning trees, seepage, steep banks | Geotechnical engineer |
| Soils and water table | Test pits, organic layers, seasonal water | Geotechnical engineer, septic practitioner |
| Permafrost | Ground ice, thaw settlement | Engineer with northern experience |
| Wildfire | Fuel, slope, access routes | Owner, local fire department |
| Radon | Long-term test in any existing building | Owner, certified radon professional |
Key points
- Use your province's building code climate table for design temperature, heating degree-days, snow and wind, and ask which values apply to your exact site.
- Part 9 roof snow load is S = Cb × Ss + Sr, with Cb = 0.55 for most roofs. A 120 m² roof carries about 25 tonnes at Prince George values and 50 tonnes at Revelstoke values.
- Check that prefabricated buildings were engineered for your snow load.
- Winter noon shadows are 3.2 times an object's height at 49° N and 3.9 times at 52° N, and longer earlier and later in the day.
- A 100-year flood has a 26% chance of occurring at least once in 30 years.
- Have slopes, creek fans, soft soils and permafrost assessed by a professional before building.
- Test any existing building for radon for at least three months; Health Canada's guideline is 200 Bq/m³.
This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.
The Comprehensive Off-Grid Manual
Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.
More guides
Buying Rural Land for Off-Grid Living
What to check before buying rural land for off-grid use: title, survey, legal access, zoning, water, septic soils, hazards, transfer tax and offer conditions.
Zoning, Permits, Building Codes and Insurance for Off-Grid Homes
How zoning, building codes, electrical, gas and sewage permits apply to off-grid homes in Canada and the US, the inspection process, and what insurers ask.
Off-Grid Solar Power: How to Size a System
Size an off-grid solar system for Canadian winters: load audit, peak sun hours, array, MPPT, inverter, wiring, fusing, with a full cabin example.