The pump and pressure system turns a well, spring or cistern into running water at the taps, and on an off-grid property it is often the largest single electrical load. This guide covers how to work out the flow a household needs, how to calculate total dynamic head and pipe friction, how to estimate the power and energy a pump uses, how to choose between pumping straight to pressure or into storage, what controls and protection a system needs, and how to keep wells, lines and pump rooms from freezing.
How much flow the household needs
A pump must deliver enough water, at enough pressure, for the fixtures likely to run at the same time. It must also not pump faster than the well can supply. Penn State Extension advises choosing a pump with a rated capacity slightly below the well's tested yield.
The Nebraska Department of Water, Energy and Environment gives two quick methods for estimating required pump capacity:
- Fixture count: 1 US gal/min (3.8 L/min) for every water outlet in the building.
- Simultaneous use: 3 US gal/min (11.4 L/min) for each outlet expected to run at the same time.
Worked example: pump capacity for a cabin
A cabin has a kitchen sink, bathroom sink, toilet, shower, washing machine and one outdoor tap: 6 outlets.
- Fixture count: 6 × 3.8 = 23 L/min (6 US gal/min).
- Simultaneous use, with the shower, toilet and kitchen sink running at once: 3 × 11.4 = 34 L/min (9 US gal/min).
A pump delivering about 25 to 35 L/min at the required pressure suits this cabin, provided the well's tested yield is higher. If the well yields only 15 L/min, the pump must be smaller, and a storage tank should make up the peak, as covered in our guide to drilled and dug wells.
Total dynamic head
A pump's capacity is always stated at a head, the height in metres (or feet) of water it can push against. Total dynamic head (TDH) adds up everything the pump must overcome:
TDH = vertical lift + pressure head + friction loss
- Vertical lift: from the pumping water level in the well (static level plus drawdown) to the pressure tank or the highest outlet. Use the pumping level, not the static level.
- Pressure head: the pressure the pump must reach at the tank, converted to head. Use the cut-out pressure, the highest the switch allows. Nebraska's guidance converts at 2.31 ft of head per psi; in metric, 1 psi is 0.703 m of water, and 1 kPa is 0.102 m.
- Friction loss: resistance in the drop pipe, buried line and fittings. It rises steeply with flow and falls steeply with pipe size.
A submersible pump sits under water, so it has no suction lift and all of the head is on the discharge side. A jet pump at the surface must also pull water up by suction; Nebraska's guidance caps total suction lift at 25 ft (7.6 m) including friction, and it falls further at high elevations.
Friction loss
Pipe makers publish friction loss tables for each pipe type and size, usually in metres per 100 m (or feet per 100 ft) at a given flow. Fittings are converted to equivalent lengths of straight pipe and added. Where no table is at hand, the Hazen-Williams formula gives a reasonable estimate for smooth plastic pipe. The values below were calculated that way for polyethylene pipe with a roughness coefficient of 150.
| Inside diameter | Flow | Friction loss per 100 m |
|---|---|---|
| 26.6 mm (about 1 in) | 30 L/min (7.9 US gal/min) | 3.6 m |
| 26.6 mm (about 1 in) | 40 L/min (10.6 US gal/min) | 6.1 m |
| 35.1 mm (about 1.25 in) | 30 L/min (7.9 US gal/min) | 0.9 m |
| 35.1 mm (about 1.25 in) | 40 L/min (10.6 US gal/min) | 1.6 m |
Raising the flow by a third raises friction loss by about 70%; one pipe size larger cuts it by about three quarters. For long horizontal runs, such as a cistern well away from the house, a larger line pays for itself in a smaller pump and lower power use.
Worked example: TDH for a drilled well
A well has a static water level of 15 m and a tested drawdown of 12 m at the planned flow, so the pumping water level is 27 m. The pressure tank is in the house, 3 m above the wellhead. The pressure switch is 40/60 psi. The line is 100 m of 26.6 mm polyethylene from pump to tank, plus fittings equal to about 10 m of pipe. Planned flow is 30 L/min.
- Vertical lift: 27 + 3 = 30 m
- Pressure head at cut-out: 60 × 0.703 = 42.2 m
- Friction: 110 m × 3.6 ÷ 100 = 4.0 m
TDH = 30 + 42.2 + 4.0 = 76.2 m (250 ft). The pump must deliver 30 L/min at 76 m of head. Pick a model whose curve passes through that point near the middle of its range, not at the end, so it still performs if the water level drops further in a dry year.
Pump power and energy
The power actually transferred to the water, called hydraulic power, follows directly from flow and head:
Hydraulic power (W) = 9.81 × flow (L/s) × TDH (m)
The pump and motor lose part of the input as heat. Divide hydraulic power by the combined efficiency of pump and motor, found from the manufacturer's performance data, to get the electrical input. Small submersible pumps are far from 100% efficient, so the electrical draw is typically two or more times the hydraulic power.
Worked example: energy per 1,000 litres
Using the well above: 30 L/min is 0.5 L/s, and TDH is 76.2 m.
Hydraulic power: 9.81 × 0.5 × 76.2 = 374 W.
If the manufacturer's data shows a combined efficiency of 40% at this duty point, electrical input is 374 ÷ 0.40 = 935 W.
Pumping 1,000 L takes 1,000 ÷ 30 = 33.3 minutes, or 0.556 h. Energy: 0.935 kW × 0.556 h = 0.52 kWh per 1,000 L.
A household using 200 L per day needs 0.2 × 0.52 = 0.10 kWh per day for water pumping. The daily energy is modest; the larger issue on an off-grid system is the 935 W running load and the much higher starting surge, which the inverter must supply.
Starting current
A fixed-speed pump motor draws a starting surge several times its running power for a moment at every start. Each start stresses the motor and, on an off-grid system, the inverter and batteries. Remedies include:
- an inverter with surge capacity well above the pump's starting load, confirmed with the pump maker;
- a soft-start device or a variable-speed (constant-pressure) pump controller, which ramps the motor up instead of starting it at full speed;
- a pressure tank large enough to limit the number of starts, as described in our water systems guide.
Constant-pressure systems
A variable-speed controller runs the pump only as fast as demand requires and holds pressure steady, so the shower does not swing between cut-in and cut-out pressure. It uses a much smaller pressure tank, set up as the controller maker specifies, and its soft start suits inverters. Check the controller's standby draw, since it is powered around the clock.
Pumping to pressure or to storage
Direct to pressure
The well pump fills the pressure tank directly and runs every time the tank pressure falls to cut-in. This is the simplest layout and suits a well with a good yield and a power system that can carry the pump's load at any hour.
Well to cistern, then booster
The well pump lifts water into a storage tank or cistern, controlled by a float switch, and a second, smaller surface pump pressurizes the house from the tank. This suits off-grid properties well:
- the well pump works only against the lift and friction, not the full pressure head, so it can be smaller;
- it can be timed to run in daylight, directly from solar or when the batteries are full;
- the cistern covers peak demand from a low-yield well;
- the booster pump is short-lift and low-power, and easy to reach for service.
Worked example: the same well pumping to a cistern
The well from the TDH example now fills an unpressurized cistern 3 m above the wellhead.
TDH = 30 m lift + 4.0 m friction = 34.0 m, with no pressure head.
Hydraulic power at 0.5 L/s: 9.81 × 0.5 × 34.0 = 167 W, less than half the figure for pumping straight to 60 psi. The booster pump then supplies the pressure head over a short distance from tank to taps.
Gravity supply
Where the property has a hillside, a cistern placed above the building can supply water with no pressure pump at all. Every metre of height between the water surface and an outlet gives about 9.8 kPa (1.42 psi) of static pressure.
Worked example: pressure from an uphill tank
A tank sits on a slope with its water surface 15 m (49 ft) above the cabin's shower head. Static pressure: 15 × 9.8 = 147 kPa (21 psi).
The supply line is 80 m of 26.6 mm polyethylene. At a shower flow of about 8 L/min, friction is small; but if a washing machine and shower run together at 30 L/min, friction is 80 × 3.6 ÷ 100 = 2.9 m, leaving 15 − 2.9 = 12.1 m, or 119 kPa (17 psi), at the outlet.
That is enough for most fixtures, though below the 40/60 psi of a pumped system. Pressure-assisted fixtures, some tankless water heaters and some treatment units need a minimum inlet pressure; check their specifications before relying on gravity alone. A small booster pump after the tank can make up the difference while keeping water available during power failures.
Components and protection
- Check valve: stops water draining back down the drop pipe when the pump stops. Submersible pumps usually have one built in; more may be added on deep settings as the pump maker specifies. Each extra check valve adds friction.
- Pitless adapter: carries the water line out through the casing below frost depth, while the casing continues above ground.
- Pressure switch and gauge: start and stop the pump. Nebraska's guidance sets tank precharge at 2 psi below the cut-in pressure; check it yearly with the tank drained of water.
- Pressure relief valve: releases pressure if the switch sticks closed and the pump keeps running. Fit one sized for the pump's capacity, discharging where a release is visible and cannot cause damage.
- Dry-run or low-water protection: shuts the pump off before the water level reaches the intake, protecting it from burning out in a low-yield well.
- Isolation valves and unions: on both sides of the pressure tank and treatment equipment, so components can be serviced without draining the whole system.
- Drain valve at the low point: needed for winterizing.
- Electrical protection: a dedicated, correctly sized circuit with a disconnect, plus the lightning and surge protection the pump maker recommends.
Freeze protection
Water expands as it freezes and splits pipes, pump housings, pressure tanks and filter housings. A frozen line on a rural property can mean weeks without water until the ground thaws, so prevention is far cheaper than repair.
Buried lines
The first defence is depth. Bury the water line below the deepest frost penetration expected at the site. In Atlantic Canada, for example, Nova Scotia Community College's plumbing training material gives about 1.2 m (4 ft) as typical frost line depth; it is shallower on the southern Pacific coast and deeper on the Prairies and in the north. Ask your building department or local well and plumbing contractors for the depth used locally, and go deeper where the line crosses a driveway or path that is ploughed, since snow cover insulates the ground and ploughed areas freeze deeper.
Where bedrock or boulders prevent burying the line deep enough, as on much of the Canadian Shield, the same training material notes that freeze protection must be installed instead: insulated, heat-traced pipe.
Insulated and heat-traced pipe
- Pre-insulated pipe comes as a carrier pipe with foam insulation and an outer jacket, sold pre-assembled or assembled on site.
- Heat tracing is an electric cable run along or inside the pipe. Use only cable listed for the purpose (UL or CSA) and approved for the pipe material, installed to the maker's instructions, with a thermostat or controller so it runs only when needed.
- Insulate over heat cable as the maker directs; insulation keeps the heat on the pipe.
- Wire it with the ground-fault protection the electrical code and cable maker require, and check it every fall before freeze-up.
Heat tracing is a continuous winter electrical load. A cable rated at, for example, 10 W per metre on a 20 m line draws 200 W, or 4.8 kWh per day if it runs continuously. On an off-grid system, the controller's thermostat settings and the length of exposed line matter a great deal; burying more of the line and heating less of it is usually the better design.
The pump room and wellhead
- Keep the pressure tank, switch, filters and treatment equipment in a heated, insulated space with a low-temperature alarm.
- Insulate exposed pipes in crawl spaces and against cold foundation walls, and insulate the main shut-off where it meets cold concrete, as Calgary's frozen-pipe guidance advises.
- Seal drafts in the pump room; a small air leak blowing on a pipe freezes it long before the room air reaches 0 °C.
Thermostat settings when away
Municipal guidance gives minimum thermostat settings for houses left unattended in winter: at least 15 °C in Calgary's guidance and no lower than 12 °C (55 °F) in Winnipeg's. Check your insurance policy, which may require a minimum temperature or regular checks during absences, or that the water system be shut off and drained.
Outdoor taps and hydrants
Shut off and drain lines to outdoor taps, hoses and water features before freeze-up. A frost-free yard hydrant has its valve below frost depth and drains the standpipe when closed, so it needs a bed of gravel at the base for the water to drain into.
Thawing a frozen pipe
- Find the frozen section by feeling along the pipe for the coldest spot.
- Open the faucet nearest to the frozen section so melting water and steam can escape.
- Apply gentle heat, working from the faucet end back toward the blockage: a hair dryer, heating pad, electric heater kept clear of combustibles, or hot towels.
- Be patient; thawing can take minutes or hours. Do not leave heaters unattended.
- Once flow returns, check the whole length for splits before closing the faucet.
Seasonal checks
- Fall: test heat tracing and the low-temperature alarm, check pump room insulation, drain outdoor lines and close their shut-offs.
- Yearly: check pressure tank precharge with the tank empty of water, check the pressure switch contacts and settings, and record the pump's running current and cycle time; a change from last year's readings is an early sign of a failing pump or a falling water level.
- After a power failure in winter: check the pump room temperature first, then that the pump restarts and the heat tracing comes back on.
- Before reopening a seasonal cabin: reassemble the system, flush the lines and test the water before drinking it.
Key points
- Estimate pump capacity at 1 US gal/min (3.8 L/min) per outlet, or 3 US gal/min (11.4 L/min) per outlet used at once, and keep the pump's rate below the well's yield.
- TDH = lift from the pumping water level + pressure head (1 psi = 0.703 m) + friction loss. One pipe size larger cuts friction by about three quarters.
- Hydraulic power = 9.81 × L/s × TDH in metres; divide by the pump's efficiency for the electrical load.
- Starting surge on fixed-speed pumps is several times running power. Soft-start and constant-pressure controllers make pumps easier on inverters.
- Pumping from the well into a cistern, then boosting, lowers the well pump's load and lets it run on daytime solar.
- In BC, only a registered well pump installer may install a pump in a well in most cases.
- Bury lines below local frost depth; where rock prevents it, use insulated, listed heat tracing on a thermostat. Never thaw pipes with a flame.
This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.
The Comprehensive Off-Grid Manual
Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.
More guides
Off-Grid Water: Wells, Rainwater and Treatment
Size a cistern from roof area and rainfall, choose wells, pumps and pressure tanks, treat and test water, and winterize an off-grid system.
Water Rights and Licensing for Wells, Springs and Streams
Who controls water in Canada, BC licensing rules as a worked model, scarcity limits, instream work approvals, US water law and checks for buyers of rural land.
Drilled and Dug Wells: Siting, Construction and Yield
Site a drilled or dug well under Canadian and US rules, learn how casing and seals work, read a yield test, meet peak demand and decommission old wells.