Off-Grid Living on the BC Coast and Vancouver Island

Regions  13 min read

The BC south coast and Vancouver Island have the mildest winters in Canada, some of the wettest ground in North America and a summer drought that surprises many new owners. This guide covers the region's design climate, snow and wind loads, foundation depth, winter solar resource, the provincial rules for wells, surface water, septic systems, building permits, owner-built homes and open burning, the rules for docks on the foreshore, wildfire and seismic risk, and the system choices that suit the coast.

Design climate

Building design in British Columbia uses the climate tables in Appendix C of the BC Building Code. The values below are from Table C-2 of the 2018 edition. They show how much the coast varies over short distances: a lot on the west side of Vancouver Island gets four times the rain of one near Victoria, and a site at the head of a mainland inlet can carry more than twice the snow of an outer-coast site.

LocationJanuary design temperature (2.5%)Heating degree-days (below 18 °C)Annual total precipitationGround snow load SsHourly wind pressure (1-in-50)
Victoria−4 °C (25 °F)2,650825 mm (32 in)1.1 kPa0.57 kPa
Nanaimo−6 °C (21 °F)3,0001,050 mm (41 in)2.1 kPa0.50 kPa
Campbell River−5 °C (23 °F)3,0001,600 mm (63 in)2.8 kPa0.52 kPa
Port Hardy−5 °C (23 °F)3,4401,850 mm (73 in)0.9 kPa0.52 kPa
Tofino−2 °C (28 °F)3,1503,300 mm (130 in)1.1 kPa0.68 kPa
Squamish−9 °C (16 °F)2,9502,200 mm (87 in)2.8 kPa0.50 kPa
Abbotsford−8 °C (18 °F)2,8601,600 mm (63 in)2.0 kPa0.44 kPa

Winter design temperatures sit only a few degrees below freezing, so heating loads are small. Precipitation falls mostly from October to March. Victoria's 2,650 heating degree-days are a little over half of Prince George's 4,720 from the same table.

Code values are for a named location and elevation. A higher or inland site will be colder and snowier; ask the local building authority which values apply to your parcel.

Snow and wind loads

The ground snow load, Ss, is the 1-in-50-year snow load on the ground in kilopascals. One kilopascal is one kilonewton on each square metre, which is about 102 kg of weight per square metre (21 lb/sq ft). The rain-on-snow load, Sr, is added to it; on this coast it is 0.2 to 0.7 kPa. A designer converts these ground values to a roof load using factors for roof slope, exposure and drifting, so the roof load is usually lower than the ground load on a simple exposed roof and higher where snow drifts against a taller wall.

Worked example: what the snow load number means

A cabin has a roof footprint of 6 m × 8 m (19.7 ft × 26.2 ft), which is 48 m² (517 sq ft).

Near Campbell River: Ss = 2.8 kPa. 2.8 kN/m² × 48 m² = 134 kN. Dividing by 9.81 gives about 13,700 kg, or 13.7 tonnes of design ground snow over that footprint.

Near Tofino: Ss = 1.1 kPa. 1.1 × 48 = 53 kN, or about 5.4 tonnes.

The two sites are about 150 km apart, yet one needs rafters, beams and posts sized for well over twice the snow of the other. A plan bought for one coastal site cannot be assumed to suit another.

Wind matters as much as snow on exposed outer-coast lots. The 1-in-50 hourly wind pressure at Tofino, 0.68 kPa, is more than half again Abbotsford's 0.44 kPa. Wind pressure drives roof uplift, the size of hold-down connectors and the anchoring of solar racks. On a headland, the exposure factor raises it further.

Foundations and frost

Frost penetration on most of the coast is shallow, but the building code still sets minimum foundation depths. Part 9 of the code (Table 9.12.2.2, quoted here from the BC Building Code 2012) works by soil type and drainage:

  • Rock: no minimum depth.
  • Coarse-grained soil (sand, gravel): no minimum depth, except below the depth of frost penetration where the building has no heated space and drainage is poor.
  • Silt: no minimum under a heated basement or crawl space; below the depth of frost penetration under an unheated building.
  • Clay or soils not clearly defined: 1.2 m (3 ft 11 in), and not less than the depth of frost penetration for an unheated building.

The local building authority sets the frost penetration depth it accepts. Small decks are exempt from the minimum depths if they are one storey or less, no more than 55 m² (592 sq ft), have joists no more than 600 mm (24 in) above the ground and support no roof. A deck on surface foundations over anything other than well-drained coarse soil or rock must have access for re-levelling.

Coastal clay and silt stay wet most of the year, so perimeter drainage, a capillary break under footings and grading away from the building are essential.

Solar resource by month

The coast has excellent summer sun and very poor winter sun. Short days combine with low sun and cloud cover from November to February. The table gives calculated day length and the sun's height above the horizon at solar noon on the 21st of each month for Port Hardy, at 50.7° N, near the north end of Vancouver Island. Victoria, at 48.4° N, is about 20 minutes longer in December and 25 minutes shorter in June.

Month (21st)Day lengthNoon sun height
January8.7 h19°
February10.3 h28°
March12.1 h39°
April14.1 h51°
May15.8 h59°
June16.5 h63°
July15.8 h60°
August14.1 h51°
September12.1 h39°
October10.2 h28°
November8.6 h19°
December8.0 h16°

Day length and sun height are calculated from latitude and do not include cloud. Natural Resources Canada publishes monthly photovoltaic potential and insolation for over 3,500 Canadian municipalities in its photovoltaic potential and solar resource maps; look up your nearest community there before sizing an array. A Natural Resources Canada study of rooftop solar potential found an average yield of about 670 kWh per kW of panels per year across all roof surfaces in North Vancouver, one of the lowest of the 11 cities studied. That average includes poorly oriented roof planes; a well-placed, south-facing array does better.

Worked example: tilting panels for the winter sun

At Port Hardy in December the noon sun is 16° above the horizon. The fraction of direct sunlight a panel collects at noon is the cosine of the angle between the sun and a line square to the panel face.

  • Panel tilted 15° from flat: its face points 75° above the horizon. The angle to the sun is 75 − 16 = 59°. cos 59° = 0.52.
  • Panel tilted 45°: the angle is 45 − 16 = 29°. cos 29° = 0.87.
  • Panel tilted 60°: the angle is 30 − 16 = 14°. cos 14° = 0.97.

In June, with the sun at 63°, the 60° panel collects cos 33° = 0.84 and the 15° panel 0.98. A steep tilt gives up a little summer output, when there is plenty, to gain most in December, when there is least. A panel at 60° also sheds wet snow faster.

Because coastal winter output is so low, most year-round coastal off-grid homes pair solar with a generator or, where a creek allows, a micro-hydro plant. Winter rain is the coast's most reliable energy resource. The solar power and battery guides cover array and battery sizing.

Water: wells, creeks and rain

Under BC's Water Sustainability Act, groundwater used only for a domestic purpose is exempt from licensing. Domestic purpose means household use by the occupants of private dwellings, including drinking, cooking, sanitation, fire prevention, watering household animals and irrigating a garden of up to 1,000 m² next to the home. It excludes multi-family apartment buildings. The province encourages owners to register domestic wells in its WELLS database.

Surface water is different. An owner may obtain a water licence for domestic use of a creek, lake or spring, which gives a place in the "first in time, first in right" priority system. Unrecorded water can be used for domestic purposes without a licence, but the user may have to show the water is unrecorded and has no security of supply if a licensed user needs it. On a coast where many creeks shrink to a trickle in August, a licence is worth having.

The coastal water problem is timing. Victoria gets 825 mm (32 in) of precipitation a year, mostly in winter. A 100 m² (1,076 sq ft) metal roof at 80% efficiency collects 100 × 825 × 0.8 = 66,000 L (17,400 US gal) a year near Victoria and 100 × 3,300 × 0.8 = 264,000 L (69,700 US gal) near Tofino. Both sites still face weeks of little or no rain in July and August, so storage, not annual rainfall, decides whether a rain system works. The water systems guide gives the full cistern sizing method.

Septic systems

Onsite sewage systems on the coast fall under the Sewerage System Regulation, made under the Public Health Act, for holding tanks and systems that discharge to ground and are designed for less than 22,700 L (5,000 imperial gal) per day. Larger systems and any system discharging to water fall under the Municipal Wastewater Regulation and need provincial authorization.

  • Who designs and builds: only an "authorized person." A registered onsite wastewater practitioner (ROWP), registered through the Applied Science Technologists and Technicians of BC, may design and install Type 1 and Type 2 systems. A professional engineer authorized for onsite work may also do Type 3 systems.
  • Type 1 is a septic tank and dispersal field. Type 2 treats effluent to less than 45 mg/L of total suspended solids and five-day biochemical oxygen demand. Type 3 treats to less than 10 mg/L of each and a median fecal coliform density below 400 CFU per 100 mL.
  • Filing: the authorized person files the system with the regional health authority and submits a letter of certification within 30 days of completing construction. The standard against which work is certified is the provincial Sewerage System Standard Practice Manual.

High winter water tables, thin soil over rock and steep lots mean many coastal sites cannot take a simple Type 1 field. Type 2 and Type 3 treatment units need power around the clock, which affects the energy budget. A composting toilet with a greywater system, covered in its own guide, avoids much of this, but greywater disposal still falls under health authority rules.

Building permits and owner-built homes

Building permits on rural parts of the coast come from the regional district, or from the municipality inside municipal boundaries. Some rural electoral areas have no building inspection service. The BC Building Code applies whether or not anyone inspects, and lenders and insurers often ask for proof of inspection.

The Homeowner Protection Act applies even where no permit is required. Before starting a new home, a builder must be licensed and must arrange third-party home warranty insurance. An owner can instead build a home for personal use as an owner-builder:

  • The owner must pass an exam and obtain an Owner Builder Authorization from BC Housing before construction starts.
  • The home cannot be sold during construction, and can be sold only after it is complete and the owner-builder has lived in it for at least one year.
  • If it is sold within 10 years, the seller must give the buyer an Owner Builder Disclosure Notice before they sign a purchase agreement, and remains personally liable for defects for the warranty periods: 2 years for materials and labour, 5 years for the building envelope and 10 years for structure.
  • Penalties for breaking the Act can reach $25,000.

Open burning and wildfire

BC classifies open fires by size. The rules come from the BC Wildfire Service, and local government bylaws can add stricter limits.

ClassDefinitionMain conditions
Campfire (Category 1)No larger than 0.5 m high by 0.5 m wide (20 in × 20 in)Fuel break around it; someone watching with a hand tool or 8 L (2 US gal) of water; fully out before leaving
Category 2One pile up to 2 m high and 3 m wide, two such piles at once, or stubble or grass up to 0.2 haFuel break around each pile; tools and a suppression system on hand; check the Ventilation Index first
Category 3Three or more Category 2 piles, any larger pile, windrows up to 200 m × 15 m, or more than 0.2 ha of grassAdditional provincial requirements; check the Category 3 page before burning

Smoke from open burning is regulated under the Open Burning Smoke Control Regulation. Burning is allowed only when the venting conditions on the day are good enough to disperse smoke. Report illegal fires on Crown land to the RAPP line at 1-877-952-7277, and fires within a fire department's area to 911.

The coast's wet winters do not protect it from summer wildfire. Second-growth forest dries out in a long August drought, and many coastal lots are reachable only by one road or by water. Keep the ground around buildings clear of dry fuel, use metal roofing and screened vents, and keep a pump, hose and stored water ready to wet down roofs. FireSmart BC publishes guidance on clearing zones around buildings.

Land and access

Much coastal recreational land is reached by boat. A water-access lot needs a moorage plan as well as a building plan.

  • Docks on Crown foreshore: private docks, ramps and boat lifts on Crown land need provincial authorization. Outside designated "Application-Only Areas," a dock built and used within the terms of the province's General Permission is authorized without an application. Elsewhere, or for docks that do not meet every term, a Specific Permission ($250 one-time fee) or a lease (normal term 20 years; $200 a year) is needed.
  • Limits: one dock per property; upland owner consent where the applicant is not the owner; no fill below the natural boundary, no dredging and no solid-core structures or cribs. Docks must not block public access along the foreshore.
  • Application-Only Areas include parts of the west coast of Vancouver Island and the Gulf Islands (new docks), Sooke Basin and parts of the mainland south coast. Check the provincial maps.
  • Federal rules: docks must meet fisheries requirements, and a mooring buoy is a "work" under the Navigation Protection Act needing federal approval. Transport Canada enforces the Private Buoy Regulations.

In the Gulf Islands, the Islands Trust is the local land-use authority, and its bylaws often limit lot coverage, tree removal and shoreline development. On much of the mainland and Vancouver Island, agricultural land is in the provincial Agricultural Land Reserve, where non-farm buildings and subdivision are restricted.

Before buying, confirm legal road access. A resource road on Crown land can be gated or deactivated, and a track across a neighbour's land may have no registered easement. Have a lawyer check the title for easements, covenants and rights of way.

Practical system choices

  • Heat: loads are modest, so a small certified wood stove is usually enough. The wood heat guide covers stove sizing.
  • Power: solar from April to September; a generator or micro-hydro for winter. A creek that runs all winter can supply more winter energy than extra panels.
  • Water: storage sized for the summer drought, filled from roof catchment or a winter creek. Keep the intake screened and the line drained or buried at the few cold sites.
  • Moisture control: water is the coast's main building hazard. Use rainscreen cladding with a drained, vented cavity, wide overhangs and good attic ventilation.
  • Corrosion: near the shore, use stainless or hot-dip galvanized fasteners and sealed enclosures for inverters and battery connections.

Northern US equivalents

Western Washington has the same wet-winter, dry-summer pattern. In Washington, a "permit-exempt" well can supply up to 18,900 L (5,000 US gal) per day for domestic use and water a lawn or garden of up to 0.2 ha (half an acre) without a water right permit. Only one exempt use of each type is allowed per project, and the homes in a subdivision must share the limits. The state's 2018 Streamflow Restoration law limits new permit-exempt domestic use in some watersheds, so check with the Washington Department of Ecology before drilling. Surface water use needs a water right permit.

Key points

  • Coastal design temperatures are mild (−2 to −9 °C), but snow loads range from 0.9 kPa at Port Hardy to 2.8 kPa at Campbell River and Squamish. Size the structure to the site.
  • Outer-coast wind pressures are high. Anchor roofs and solar racks for them.
  • Winter solar is poor: about 8 hours of daylight and a noon sun near 16 to 18° in December. Tilt panels steeply and plan for a generator or micro-hydro.
  • Domestic groundwater needs no licence; a domestic surface water licence is optional but gives security of supply.
  • Septic systems must be designed and installed by an authorized person and filed with the health authority.
  • New homes need a licensed builder with warranty or an Owner Builder Authorization from BC Housing, even where no building permit is required.
  • Know the open fire categories, check venting conditions, and confirm moorage authorization and legal road access before buying water-access land.

This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.

The Comprehensive Off-Grid Manual

Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.

Regions

Off-Grid Living on the Prairies

Prairie design cold, snow and wind loads, frost depth, solar by month, Saskatchewan and Manitoba septic and burning rules, dugouts, floods and systems.

12 min read