Site Work, Drainage and Foundations in Frost Country

Shelter  13 min read

Frost causes more foundation trouble in Canada and the northern United States than load does. Water in the soil freezes, expands and lifts footings, piers and slabs, then thaws and lets them settle unevenly. Good foundations in frost country start with reading the soil, keeping water away from the building and choosing a foundation that suits the site. This guide covers how frost damages foundations, how to investigate soil, site preparation and drainage, minimum footing depths and sizes under the building code, the main foundation types for off-grid buildings, cold-weather concrete and when a professional must be involved.

How frost damages foundations

Frost heave

Frost heave needs three things at once: a frost-susceptible soil, a supply of water, and freezing temperatures reaching into the soil. As the ground freezes, fine-grained soils such as silt draw water up toward the freezing front, where it forms layers of ice called ice lenses. The lenses grow and push the ground, and anything resting on it, upward. Heave is rarely even, so a building rises more at one corner than another, cracking foundations, jamming doors and breaking pipes.

Remove any one of the three conditions and heave stops. That is the basis of every frost protection method:

  • Go deeper than frost. Place footings below the depth to which the ground freezes.
  • Keep frost out. Insulate the ground around a shallow foundation, or let heat from the building keep the soil beneath it unfrozen.
  • Remove the water. Drain the soil around and under the foundation.
  • Replace the soil. Bear on rock, or on clean, coarse granular material that does not hold water by capillary action.

Adfreeze

Frozen soil can also grip the sides of a post, pier or pile and lift it, even when its base is below frost depth. This is called adfreeze. Smooth sides, a base wider than the shaft, enough embedment below frost and a backfill of free-draining material all help a pier resist it. Engineers design piles for adfreeze uplift in severe frost.

Reading the soil

Soil type decides both bearing capacity and frost behaviour. The building code's Part 9 table of allowable bearing pressures gives values for common soils where no site investigation is done.

Soil or rockMaximum allowable bearing pressureFrost behaviour
Sound rock500 kPa (10,440 lb/sq ft)Not frost-susceptible if sound and unfractured
Clay shale300 kPa (6,270 lb/sq ft)Varies; can weaken when exposed to water and frost
Till200 kPa (4,180 lb/sq ft)Varies with fines content
Dense or compact sand or gravel150 kPa (3,130 lb/sq ft)Low when clean and well drained
Stiff clay150 kPa (3,130 lb/sq ft)Moderate to high
Dense or compact silt100 kPa (2,090 lb/sq ft)High: the most frost-susceptible common soil
Firm clay75 kPa (1,570 lb/sq ft)Moderate to high
Loose sand or gravel50 kPa (1,040 lb/sq ft)Low when clean, but settles under load
Soft clay40 kPa (835 lb/sq ft)High

Where footings bear on gravel, sand or silt and the water table lies within one footing width below the bearing surface, the code halves these allowable pressures. Footing widths and areas taken from the Part 9 footing table must then be doubled. Organic soils, peat and uncontrolled fill have no listed value; they must be removed or the foundation designed by an engineer.

Investigating the site

  • Dig test pits at the building location, with a small excavator if possible, to at least the planned footing depth and preferably below it. Note each soil layer, its colour, texture and depth.
  • Look for water. Note any seepage into the pit, and come back after a day to see where water stands. Grey or mottled soil often marks a seasonal high water table.
  • Find the organics. Measure the depth of topsoil, roots and any buried organic layers.
  • Ask neighbours and the building department how deep foundations are built locally and what problems have occurred.

Hire a geotechnical engineer if you find silt, soft clay, organic layers, fill, a high water table, signs of slope movement or permafrost, or if the building is large or heavy. The code requires that where soil movement from moisture changes or freezing could damage a building, measures be taken to prevent it or reduce its effects, and that slope stability be evaluated where it is in question.

Site preparation

  • Clear and strip. Remove topsoil and vegetable matter from all areas under the building. The bottom of every excavation must be free of organic material. Stockpile topsoil for later landscaping, away from the excavation.
  • Keep water out of the excavation. Excavations must be kept free of standing water. Ditch around the top and pump out rainwater before it softens the bearing soil.
  • Keep frost out of the excavation. The bottom of the excavation must be protected from freezing throughout construction. Never place footings on frozen ground; when it thaws, the footing settles. Cover exposed bearing soil with insulated blankets or straw and plastic in cold weather.
  • Use proper fill. Freeze-susceptible material must not be used as fill beneath floors that will be exposed to freezing. Use clean crushed stone or gravel, placed in thin layers and compacted. Ask the building department before placing any footing on fill.

Drainage

Keeping water away from the foundation removes one of the three conditions for frost heave and prevents wet basements and crawl spaces.

Surface drainage

The code requires the building to be located, or the site graded, so that water does not collect at or near the building, and backfill to be graded so that water drains away from the foundation after settling. Canada's code gives no number. The US International Residential Code requires the ground to fall at least 152 mm (6 in) within the first 3 m (10 ft), a slope of about 5%, which is a sound target in either country.

  • Direct surface water away from wells and septic fields as well as from buildings.
  • Carry downspouts onto splash pads or into pipes that discharge well away from the foundation.
  • On a slope, cut a swale or ditch on the uphill side to carry runoff around the building.

Foundation drains

Part 9 requires the bottom of every exterior foundation wall to be drained, unless it is shown to be unnecessary, using drain pipe or a granular drainage layer:

  • Drain pipe of at least 100 mm (4 in) diameter, laid on undisturbed or well-compacted soil, with its top below the underside of the floor slab or crawl space ground cover.
  • At least 150 mm (6 in) of crushed stone or other coarse, clean granular material over the top and sides of the pipe, with no more than 10% passing a 4 mm sieve.
  • Or, instead of pipe, a continuous granular layer at least 125 mm (5 in) deep beneath the footings and extending at least 300 mm (12 in) beyond their outside edge, graded to a sump.

Where the water goes

Foundation drains must discharge to a sewer, drainage ditch or dry well. Off-grid, that usually means a ditch or daylight outlet downhill, or a dry well:

  • A dry well is allowed only where the natural groundwater level is below its bottom. It must be at least 5 m (16 ft) from the foundation and located so drainage flows away from the building.
  • Where gravity drainage is not practical, a sump pit at least 750 mm (30 in) deep and 0.25 m² (2.7 sq ft) in area, with a secure, airtight cover, and an automatic sump pump are required. Off-grid, include the pump in the power budget and protect its discharge line from freezing.

How deep footings must go

Part 9 sets minimum foundation depths below finished ground by soil type, drainage and whether the foundation encloses heated space.

SoilHeated basement or crawl spaceNo heated space: good drainageNo heated space: poor drainage
RockNo limitNo limitNo limit
Coarse-grained soilsNo limitNo limitBelow frost penetration depth
SiltNo limitBelow frost penetration depthBelow frost penetration depth
Clay, or soils not clearly defined1.2 m (3 ft 11 in)1.2 m, and not less than frost penetration depth1.2 m, and not less than frost penetration depth
  • The heated columns apply only where the foundation is not insulated in a way that reduces heat flow to the soil under the footings. Insulating the outside of a basement or crawl space wall down to the footing cuts that heat, so the "no heated space" depths apply.
  • Depths may be reduced where local experience with the soil, or a foundation design, shows that lesser depths are adequate. This is how insulated shallow foundations are accepted.
  • Ontario's code, for example, exempts non-masonry accessory buildings of one storey and not more than 55 m² (592 sq ft), with floor joists no more than 600 mm (24 in) above ground, from these depth rules. Unattached decks of the same limits that do not support a roof are also exempt. Check your own province's code.

Frost penetration depth is not listed in the code; it depends on local climate, soil, moisture and snow cover. Ask the building department for the local design frost depth. Snow insulates the ground, so areas kept clear of snow, such as driveways and paths, freeze deeper than the surrounding ground.

In the US, the International Residential Code requires exterior footings at least 305 mm (12 in) below undisturbed ground, and protected from frost by extending below the local frost line, by construction to ASCE 32 for frost-protected shallow foundations, or by bearing on solid rock.

Foundation types for off-grid buildings

TypeHow it handles frostSuitsWatch for
Full basementFootings well below frost; heated space aboveYear-round homes on well-drained soil; space for a power room and cold storageCost, drainage, radon, a high water table
Crawl spaceFootings below frost, or insulated wallsHomes where a basement is not neededMoisture control, freeze protection of pipes in the crawl space
Slab-on-grade with insulated edgeHeat from the house and ground insulation keep frost outHeated, year-round buildings on stable soilRequires design if footings are above frost depth; unheated buildings are not protected
Frost-protected shallow foundationHorizontal insulation around the perimeter keeps frost from the footingHeated houses; less excavation in rock or wet groundMust be designed for local frost; insulation must not be damaged or removed
Concrete piers on spread footingsFooting below frost; pier sides resist adfreezeCabins, decks, outbuildings, sloping sitesUplift by adfreeze; bracing against wind and lateral load
Helical (screw) pilesSteel shaft with helical plates below frostQuick installation, sites without concrete accessEngineered design and certified installer required
Permanent wood foundationTreated wood walls on granular footings below frostSites where concrete delivery is difficultMust follow CSA S406 and the code; drainage is critical
Skids, blocks or adjustable supportsNo frost protection; building is allowed to move and is re-levelledSmall exempt sheds, permafrost sites with designed systemsNot acceptable for most dwellings

Insulated shallow foundations

A frost-protected shallow foundation places rigid insulation on the outside of the foundation and horizontally outward under the ground, so heat from the building and the ground keeps the soil under the footing above freezing. It saves excavation on rock or in wet ground, but relies on the building being heated; a cabin left unheated over winter can heave. Have it designed for your site and confirm acceptance with the building department first.

Helical piles

Helical piles are steel shafts with welded helical plates, screwed into the ground with machinery and ready to load immediately. Canadian practice, set out in CCMC evaluations and local building department guidance, is that:

  • a registered professional engineer designs the piles for the project, setting their number, spacing and loads;
  • installers are certified by the manufacturer and follow its instructions and the CCMC report;
  • each pile carries a label identifying the manufacturer, material standards and CCMC number;
  • where corrosion conditions are not assessed, the piles are hot-dip galvanized, to at least 610 g/m² of zinc;
  • the engineer or installer provides documents confirming the installation matches the design.

Sizing footings

Part 9 sets minimum footing sizes by the number of floors supported, for light-frame buildings on soils that meet its assumptions.

Floors supportedStrip footing width, exterior wallsStrip footing width, interior wallsColumn footing area (columns 3 m apart)
1250 mm (10 in)200 mm (8 in)0.40 m² (4.3 sq ft)
2350 mm (14 in)350 mm (14 in)0.75 m² (8.1 sq ft)
3450 mm (18 in)500 mm (20 in)1.0 m² (10.8 sq ft)

Joist spans over 4.9 m (16 ft) require larger footings. A footing must be at least 100 mm (4 in) thick, and no thinner than the distance it projects beyond the wall or pier it supports. Check the table in the edition of the code in force in your province, as editions differ in detail.

Worked example: a column footing for a pier

A one-storey cabin sits on concrete piers 3 m (10 ft) apart. The table requires 0.40 m² of footing per pier.

Size: a square footing of √0.40 = 0.632 m, or about 640 mm (25 in) on each side.

Thickness: the pier is 200 mm (8 in) across, centred on the footing. The footing projects (632 − 200) ÷ 2 = 216 mm beyond the pier on each side, so it must be at least 216 mm (8.5 in) thick. This uses the minimum required area, even if you choose to pour a larger footing.

Wet silt: if the footing bears on silt and the water table is within one footing width below it, the area doubles to 0.80 m², a square of √0.80 = 0.894 m, about 900 mm (35 in) a side. The projection becomes (894 − 200) ÷ 2 = 347 mm, so the footing must be at least 347 mm (14 in) thick.

Worked example: checking a pier load against the soil

Where an engineer gives a design load, the check is: required area = load ÷ allowable bearing pressure. The load here is an example input.

A pier carries a floor and roof area of 2.4 m × 3.0 m = 7.2 m². Suppose the designer's total load, including snow, is 4.5 kPa over that area: 7.2 × 4.5 = 32.4 kN.

On firm clay at 75 kPa, the area needed is 32.4 ÷ 75 = 0.43 m², a square of about 660 mm (26 in). On dense sand or gravel at 150 kPa, it is 0.22 m², but the Part 9 minimum of 0.40 m² still governs for a one-storey building. On soft clay at 40 kPa, it is 0.81 m², and soft clay calls for an engineer in any case.

Piers and posts

  • Use a footing wider than the pier at the base, below frost depth, so the pier is anchored against uplift as well as supported.
  • Use smooth form tubes and backfill around piers with free-draining granular material rather than silt or clay, to reduce adfreeze.
  • Brace a pier foundation against wind and lateral loads. Tall piers on a slope need diagonal bracing or engineered design.

Concrete in cold weather

The BC Building Code requires that when the air temperature is below 5 °C (41 °F), including night-time lows, concrete be kept between 10 °C and 25 °C (50 °F and 77 °F) while it is mixed and placed, and held at not less than 10 °C for 72 hours after placing. No frozen material or ice may be used in the mix. Use insulated blankets, straw and plastic, heated enclosures or heating cables. Concrete that freezes while curing can lose much of its strength, and a building official may require an engineer to review it.

Backfilling

  • Backfill within 600 mm (24 in) of the foundation must be free of harmful debris and of boulders larger than 250 mm (10 in).
  • Place backfill in layers, and never backfill with frozen soil or snow, which settles when it melts.
  • Finish with a low-permeability top layer, such as clay or topsoil, sloped away from the wall, so surface water runs off rather than soaking down beside the foundation.

Permafrost

On ground that stays frozen year-round, the aim reverses: keep the ground frozen. A heated building placed directly on ice-rich permafrost thaws the soil beneath it and settles. Common approaches lift the building on adjustable supports or piles, leave an open, ventilated air space beneath it, and place it on a thick gravel pad. These are specialist designs; use an engineer with northern experience and the guidance in CSA PLUS 4011, the Canadian technical guide for infrastructure in permafrost.

Key points

  • Frost heave needs frost-susceptible soil, water and freezing. Remove one and heave stops: go deep, insulate, drain, or replace the soil.
  • Silt is the most frost-susceptible common soil; clean, well-drained sand, gravel and sound rock are the least.
  • Strip topsoil and organics, keep excavations dry and unfrozen, and never use freeze-susceptible fill under floors.
  • Grade ground away from the building, ideally falling 150 mm in the first 3 m, and drain footings with 100 mm pipe under 150 mm of clean stone.
  • On clay or undefined soils, Part 9 footings go at least 1.2 m deep, and below frost penetration where the foundation is unheated or insulated.
  • One-storey Part 9 footings are at least 250 mm wide for exterior walls and 0.40 m² for columns, doubled on wet sand, gravel or silt.
  • Screw piles, shallow insulated foundations and permafrost foundations need engineered design. Protect concrete placed below 5 °C for 72 hours.

This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.