The Yukon combines a dry, subarctic climate with long, very cold winters, short summers with almost continuous daylight, permafrost in parts of the territory and a land system shaped by modern treaties with Yukon First Nations. This guide covers design temperatures and snow loads, the solar resource by month using measured Yukon data, foundations, the territory's building code and permit rules, sewage permits, burning permits, Settlement Land and public land, wildfire and flood risk, and practical system choices for cabins and homesteads outside Whitehorse.

Design climate

The NOAA Engineering Weather Data record for Whitehorse airport, 703 m (2,307 ft) elevation, for 1973 to 1996, gives a 99% heating design temperature of −36 °C (−33 °F) and a 99.6% value of −40 °C (−40 °F). Annual heating degree-days are about 6,920 below 18 °C. These are annual percentile values, not the National Building Code's January 2.5% value; the Government of Yukon can confirm the values to use for design.

Valley bottoms are colder than the airport on calm winter nights, because cold air drains downhill and pools. A cabin on a low bench by a river can see temperatures well below the design value, while one on a slope a few tens of metres higher stays warmer. Dawson and the central valleys are colder still.

Worked example: heat load at Whitehorse design cold

A small, well-insulated house loses 120 W for every 1 °C of difference between inside and outside, and is kept at 20 °C.

At −40 °C, the difference is 60 °C. The heating load is 120 × 60 = 7,200 W, or 7.2 kW (about 24,600 BTU/h).

Over a year: 120 W/°C × 6,920 degree-days × 24 h = 19,930,000 Wh, about 19,900 kWh. That is about twice the same house near Kelowna, BC (3,400 degree-days), and about 2.6 times one near Victoria (2,650 degree-days).

Snow and wind

Yukon snowfall is light by Canadian standards, but it stays all winter. The 2010 National Building Code values, as reproduced in a 2014 Boise Cascade specifier guide, are:

LocationSs (ground snow)Sr (rain on snow)Hourly wind pressure q (1-in-50)
Whitehorse1.8 kPa0.1 kPa0.38 kPa
Dawson2.7 kPa0.1 kPa0.31 kPa

Confirm current values with the territory before designing. A roof footprint of 48 m² (517 sq ft) at Dawson carries a design ground snow of 2.7 × 48 = 130 kN, about 13.2 tonnes. Because winter snow rarely melts until spring, it accumulates on roofs and around buildings for six months or more.

Solar resource by month

Day length in the Yukon swings from under 6 hours to over 19 hours at Whitehorse, and more farther north. The table gives calculated day length and noon sun height on the 21st of each month at Whitehorse, 60.7° N.

Month (21st)Day lengthNoon sun height
January6.9 h9°
February9.5 h18°
March12.1 h29°
April15.1 h41°
May17.8 h49°
June19.2 h53°
July17.9 h50°
August15.2 h41°
September12.2 h29°
October9.3 h18°
November6.8 h9°
December5.6 h6°

At Dawson, 64.1° N, the December day is 4.2 hours and the noon sun only 3° high. At Old Crow, 67.6° N, north of the Arctic Circle, the sun does not rise for about two weeks around the winter solstice and does not set for about six weeks around the summer solstice. Mountains to the south can block a low winter sun entirely, so some valley sites get no direct sun at all for weeks in December and January.

Measured output near Whitehorse

A Natural Resources Canada performance review of the 50.22 kW community solar array at Mt. Lorne, south of Whitehorse, tilted at 45°, reported these monthly yields for June to December 2019:

Month (2019)Energy per kW of panels
June79 kWh/kW
July108 kWh/kW
August106 kWh/kW
September93 kWh/kW
October57 kWh/kW
November19 kWh/kW
December4 kWh/kW

The report attributed much of the winter drop to snow on the panels and shading at low sun angles, and noted that snow on the ground can raise winter output by reflection. December output was about one twenty-seventh of July's. Snow depth records from Whitehorse for 2005 to 2012, cited in the same report, showed snow on the ground from early October to mid-April, with maximum depths of up to 45 cm (18 in).

Worked example: what a solar array can and cannot do

A cabin uses 3 kWh a day, about 93 kWh a month. Using the Mt. Lorne yields:

  • July: 93 ÷ 108 = 0.86 kW of panels covers the month.
  • October: 93 ÷ 57 = 1.6 kW.
  • November: 93 ÷ 19 = 4.9 kW.
  • December: 93 ÷ 4 = 23 kW.

An array of 23 kW for a 3 kWh-a-day cabin is not practical. A sensible design uses 2 to 3 kW of panels, which covers the load from about February to October, and a generator or other source for November to January. The solar power guide covers array sizing; the battery guide covers storage. Steeper tilts than 45° shed snow better and catch more of the low sun in spring and fall.

Worked example: covering the dark months with a generator

The same cabin has 2.5 kW of panels. In December, at the Mt. Lorne yield of 4 kWh/kW, the array makes 2.5 × 4 = 10 kWh in the month, or 10 ÷ 31 = 0.32 kWh a day.

The daily shortfall is 3 − 0.32 = 2.68 kWh. A battery charger delivering 2 kW into the batteries needs 2.68 ÷ 2 = 1.3 hours of generator time a day to make it up, plus extra to cover charging losses. Running the generator for one longer session every two or three days, with the batteries sized to carry the cabin in between, means fewer starts in the cold.

The same arithmetic in July shows a large surplus: 2.5 × 108 = 270 kWh in the month against a load of 93 kWh. That summer surplus can run a freezer, a water pump for the garden or power tools without extra cost.

Foundations and permafrost

Where there is no permafrost, Part 9 of the National Building Code (Table 9.12.2.2) sets minimum foundation depths by soil type: none on rock or well-drained coarse soil, and at least 1.2 m (3 ft 11 in) on clay or soils not clearly defined, and below the depth of frost penetration for buildings without heated space. In the Yukon, frost goes deep and many cabin foundations are not heated.

Permafrost occurs in parts of the territory, and it can be patchy within a single property. A heated building set directly on ice-rich permafrost thaws the ground beneath it, and the building settles unevenly. Before building:

  • Have the site investigated by a geotechnical engineer, or at least dig test pits, in late summer when the active layer is deepest.
  • On permafrost, keep the building off the ground with adjustable posts, screw piles or a space-frame foundation, and leave a ventilated air space below so the floor does not warm the ground.
  • Do not strip the moss and organic layer more than needed; it insulates the permafrost.
  • Direct roof runoff and greywater away from the foundation, since water carries heat into frozen ground.

Building code and permits

The Government of Yukon enforces the 2020 National Building Code and will adopt the 2025 edition on June 22, 2027. Section 9.36, on energy efficiency, was adopted in 2016 with Yukon changes:

  • Homes must reach a minimum EnerGuide rating of 78. A home that does can reduce ceiling insulation from R60 to R40 and drop the crawl space floor insulation requirement.
  • Homes of 44.6 m² (480 sq ft) or less do not need to meet Section 9.36.
  • Squared logs must be at least 203 mm (8 in) thick and round logs at least 254 mm (10 in) in diameter. Log homes outside Whitehorse are exempt from Section 9.36.

Worked example: what the EnerGuide trade-off means

A house has 60 m² (646 sq ft) of ceiling. R60 is about RSI 10.6, and R40 about RSI 7.0. At a 60 °C difference between inside and outside, heat loss through the ceiling is area × temperature difference ÷ RSI:

  • R60: 60 × 60 ÷ 10.6 = 340 W.
  • R40: 60 × 60 ÷ 7.0 = 514 W.

The thinner ceiling loses about 170 W more at design cold. The territory accepts that only if the whole house reaches EnerGuide 78, which in practice means a very airtight envelope and good windows, where the larger savings are.

Outside Whitehorse city limits, the Government of Yukon issues building permits; inside them, the City of Whitehorse does, under its own bylaws, which are usually stricter than the National Building Code. A territorial residential permit is needed to:

  • build, demolish or move a structure, including placing a mobile or modular home;
  • build a residential accessory or storage building over 12 m² (130 sq ft);
  • build a deck that needs guards or handrails;
  • add a bedroom or change bedroom windows;
  • add or change plumbing;
  • install or replace a woodstove, pellet stove, oil-fired heater or other fuel-fired equipment, or change or move a chimney;
  • install a fuel tank, change a building's use, or add a secondary suite.

A development permit may be needed first. Permits are usually issued within 5 business days of a complete application, and the work must be started and inspected within 6 months. Large or complex projects may also need Letters of Assurance of Professional Design and Field Review and a code analysis. A formal appeal to the Building Standards Board must be sent in writing to the Chief Building and Plumbing Inspector within 30 days of the decision.

Sewage systems

A building not connected to a municipal sewer needs a sewage disposal system permit from the territory's Environmental Health Services, obtained before any part of the system is installed. The design can be prepared by the homeowner, a contractor or an engineering consultant; a design that departs from the territory's guidelines must be engineered by a professional. The application fee is $50, paid after approval. The territory also has forms for approval to use a completed system, holding tanks, privies, and retaining or decommissioning a system; ask Environmental Health Services which apply.

Burning permits

From April 1 to September 30, a burn permit is needed for any open fire in the Yukon except a campfire. That includes burning grass, debris or brush, and burning in a burn barrel, on public or private land.

  • Inside Whitehorse, Dawson or Watson Lake city limits, contact the city fire department; each sets its own rules.
  • Outside those limits, call the local Wildland Fire Management office. Paper permits are no longer used, and calls are taken only in weekday business hours, so plan early-morning and weekend burns in advance.
  • Permission is given only at low fire danger and can be cancelled at any time. The person burning must supervise the fire, have tools to put it out, and is responsible for any damage if it escapes.

Land: Settlement Land and public land

The Yukon has 14 First Nations. Eleven have signed modern treaties, each made up of a Final Agreement and a Self-Government Agreement, signed between 1993 and 2005. Under the Umbrella Final Agreement, about 41,595 km² was identified as Settlement Land, owned and managed by the First Nations with Final Agreements. There are three types:

  • Category A: the First Nation owns the surface and the subsurface, including mines and minerals.
  • Category B: the First Nation owns the surface; the Government of Yukon administers minerals.
  • Fee simple Settlement Land: the First Nation holds the same property rights as other private landowners, and the land is withdrawn from mineral staking.

The public can generally use Settlement Land for activities that do not significantly affect the land and are not commercial, such as hiking, walking a dog, riding a horse, or using an ATV on certain roads and trails that existed before the Final Agreements, staying on the travelled part. Cutting, clearing or building is not in that category. Contact the First Nation government that owns the land before any other use.

First Nations' Traditional Territories cover almost all of the Yukon. First Nations do not own their Traditional Territory, but they have a large say in how it is managed, and their harvesting and other rights apply across it.

Most other land is public land administered by the Government of Yukon. It can be acquired by buying a developed lot, through land lotteries and tenders, or by applying for undeveloped land for a residence or business, for agriculture or grazing, or for a trapping cabin. Each route has its own policy and review process, and land application decisions can be appealed.

Wildfire and flood

  • Wildfire: large wildfires are a normal part of the Yukon's boreal forest. Many rural properties are reached by a single road. Clear flammable material around buildings, use metal roofing, keep a pump and hose with a water source, and know when and how you would leave.
  • Flooding: spring breakup brings ice jams and high water on rivers, and some lakes rise sharply after heavy snow years. Keep buildings, fuel and batteries above known flood levels.
  • Isolation: help can be hours away. Carry winter survival gear in every vehicle, keep a satellite communication device at remote sites, and leave a trip plan with someone each time you travel in winter.

Choosing a cabin site

In the Yukon, the shape of the land around a site matters as much as the site itself.

  • Winter sun: at Whitehorse the December noon sun is 6° above the horizon. A ridge 1 km (0.6 mi) to the south blocks it if it rises more than 1,000 × tan 6° = 105 m (344 ft) above the site. Check the southern horizon with a clinometer or a phone app before buying, and expect a valley-floor site to lose the sun for part of the winter.
  • Cold air: cold air drains into hollows and valley bottoms. A site partway up a south-facing slope is usually warmer, sunnier and drier than one beside the river.
  • Frozen ground: north-facing slopes, wet ground under moss and black spruce are where permafrost is most likely. Dry, south-facing, well-drained sites are the easiest to build on.
  • Water: a lake or creek within reach of a pump line simplifies summer water and firefighting, but keep buildings above flood and ice-jam levels.
  • Access: spring breakup can make dirt roads impassable for weeks. Plan supplies around it.

Practical system choices

  • Heat: wood heat is standard, with a backup able to keep the building above freezing when no one is there. With nearly 7,000 heating degree-days at Whitehorse, a large woodpile and an airtight, well-insulated building are both essential; the wood heat guide covers sizing and cords per winter.
  • Power: solar from February to October, a generator for the dark months. Some sites have a creek that supports micro-hydro, but most Yukon creeks freeze or drop very low in winter, so check winter flow before relying on one.
  • Water: many cabins haul water or draw from a lake through the ice. Buried lines need to be very deep or heat-traced. An indoor cistern in a heated space is the simplest winter supply.
  • Waste: composting toilets and privies are common at seasonal cabins; check with Environmental Health Services about permits.
  • Fuel and engines: use winter-grade diesel and fuel conditioner, and keep generators and vehicles plugged in or housed in a heated shelter. Propane does not vaporize below about −42 °C (−44 °F), so propane appliances fail in deep cold unless the tank is kept warm.
  • Batteries: keep them in a heated space. Many batteries cannot be charged below freezing; check the manufacturer's limits.

Alaska

Interior Alaska shares the Yukon's climate. Septic, well and building rules there are set by the State of Alaska and by boroughs and cities where they have their own codes. Confirm who owns any rural land before using it.

Key points

  • Whitehorse design cold is about −36 to −40 °C, with about 6,920 heating degree-days; valley bottoms are colder.
  • December has 5.6 hours of daylight at Whitehorse and none at Old Crow. Measured December solar output near Whitehorse was 4 kWh per kW of panels; plan a generator for November to January.
  • Investigate for permafrost before building, and keep heat out of frozen ground.
  • The Yukon enforces the 2020 National Building Code; outside Whitehorse, the territory issues building permits, including for woodstoves and fuel tanks.
  • Get a sewage disposal permit before installing any part of a system, and a burn permit for any fire except a campfire from April 1 to September 30.
  • Respect Settlement Land: low-impact, non-commercial use only, and contact the First Nation for anything else.

This guide is general information. Codes, permits and safety requirements vary by province, state and municipality. Check local rules and use a qualified professional for electrical, gas, chimney and septic work where required.

The Comprehensive Off-Grid Manual

Every off-grid system in one manual, with worked examples, checklists and northern-climate detail.

Regions

Off-Grid Living on the Prairies

Prairie design cold, snow and wind loads, frost depth, solar by month, Saskatchewan and Manitoba septic and burning rules, dugouts, floods and systems.

12 min read